Forum quick links
Data center - Baseline HVAC System
NC-v4 EAp2:Minimum energy performanceposted by Vassil Vassilev on
Hi Markus and all coleagues, In the Data center I'm about to start modeling, there are 4 IP rooms. Each of these rooms has IP load with a power density of 3.2 kW/m2 or 297 W/ft2.
Exemplary Performance Over 95% Diverted
NC-v4 MRc5:Construction and demolition waste managementposted by Cynthia Kaplan on
Has this bonus point gone away? There is no longer a point awarded for achieving a diverted rate over 95%?
Cycle lane between project and Bicycle Network
NC-v4 LTc6:Bicycle facilitiesposted by Alicia Costas Freire on
Hello, My understanding from the LEED manual is that the credit does not require provision of a dedicated cycle lane between the building and the bicycle network and I was wondering if someone cou
Air Barrier for Existing Building
NC-v4 EAp2:Minimum energy performanceposted by Martin Meehan on
Hi all, This query follows on a similar theme to the previous topic. We are working on an existing building that is intending to improve the envelop performance by internally adding insulation to
reference book LEED v4 ND is it mistake?
ND-v4 NPDp1:Walkable streetsposted by natalia rakhmanova on
Please any AP ND explain me how they got BH-SC ratios 1:0,6 1:0,86 and 1:1,33 instead of 1:1,66 1:1,16 and 1:0,75 ?
Adoption of Investigated Strategies
NC-v4 IPc1:Integrative processposted by Philippa Cameron on
Do you need to adopt all strategies that you demonstrate as facilitating best energy performance for this credit?
On-site restoration
NC-v4 SSc2:Site development - protect or restore habitatposted by Anaïs P on
Have the 30% of areas with native and adaptated vegetation to be in the same place of the previously developped areas?
Acoustic performance: reverberation time
NC-v4 EQc9:Acoustic performanceposted by alessandro santuari on
Hi, we have a project with large waiting rooms: are there specific values for "Reverberation time requirements", as there are not similar room type in the table 2 of reference guide? Thanks
Sustainable Agriculture and
EBOM-v4 MRc1:Purchasing - ongoingposted by Meier Corporate Account on
Is there a way, outside creating another pilot program, to update the spreadhseet for the Purchasing - Ongoing credit? 1. Food Alliance is no longer a viable entity.
WEp1 and c1: Indoor Water Use Reduction
CI-v4 WEp1:Indoor water use reductionposted by BEE Incorporations on
Hi! We understand that all newly installed water fixtures must be WaterSense labeled.