LEEDuser’s viewpoint
Frank advice from LEED experts
LEED is changing all the time, and every project is unique. Even seasoned professionals can miss a critical detail and lose a credit or even a prerequisite at the last minute. Our expert advice guides our LEEDuser Premium members and saves you valuable time.
Credit language
© Copyright U.S. Green Building Council, Inc. All rights reserved.
Requirements
Option 1. Transit-served location (1–4 points)
Locate any functional entry of the project within a ¼-mile (400-meter) walking distance of existing or planned bus, streetcar, or rideshare stops, or within a ½-mile (800-meter) walking distance of existing or planned bus rapid transit stops, light or heavy rail stations, commuter rail stations or ferry terminals. The transit service at those stops and stations must meet the minimums listed in Tables 1 and 2. Planned stops and stations may count if they are sited, funded, and under construction by the date of the certificate of occupancy and are complete within 24 months of that date.- Qualifying transit routes must have paired route service (service in opposite directions).
- For each qualifying transit route, only trips in one direction are counted towards the threshold.
- If a qualifying transit route has multiple stops within the required walking distance, only trips from one stop are counted towards the threshold.
Table 1. Minimum daily transit service for projects with multiple transit types (bus, streetcar, rail, or ferry)
Weekday trips |
Points |
---|---|
72 |
1 |
144 |
2 |
360 |
4 |
Table 2. Minimum daily transit service for projects with commuter rail or ferry service only
Weekday trips |
Points |
---|---|
24 |
1 |
40 |
2 |
60 |
3 |
OR
Option 2. Pedestrian access (1–4 points)
Show that the project has an attendance boundary such that the specified percentages of students live within no more than a 3/4-mile (1200-meter) walking distance (for grades 8 and below, or ages 14 and below), and 1 1/2-mile (2400-meter) walking distance (for grades 9 and above or ages 15 and above) of a functional entry of a school building. Points are awarded according to Table 3.Table 3. Points for student population within walking distance
Percentage of students |
Points |
---|---|
50% |
1 |
60% |
2 |
70% or more |
4 |
What does it cost?
Cost estimates for this credit
On each BD+C v4 credit, LEEDuser offers the wisdom of a team of architects, engineers, cost estimators, and LEED experts with hundreds of LEED projects between then. They analyzed the sustainable design strategies associated with each LEED credit, but also to assign actual costs to those strategies.
Our tab contains overall cost guidance, notes on what “soft costs” to expect, and a strategy-by-strategy breakdown of what to consider and what it might cost, in percentage premiums, actual costs, or both.
This information is also available in a full PDF download in The Cost of LEED v4 report.
Learn more about The Cost of LEED v4 »Frequently asked questions
Would a university or corporate campus shuttle service count towards this credit? The answer to this question is available to LEEDuser premium members. Start a free trial » (If you're already a premium member, log in here.) |
What’s the difference between a commuter rail, light rail, and heavy rail transit system? I’m having trouble figuring out how to categorize the different types of transit serving my project. The answer to this question is available to LEEDuser premium members. Start a free trial » (If you're already a premium member, log in here.) |
Our project is located in a place without any existing or planned formal transit networks. How can we achieve this credit? The answer to this question is available to LEEDuser premium members. Start a free trial » (If you're already a premium member, log in here.) |
What are the criteria for whether we are allowed to count future or planned transit stops? The answer to this question is available to LEEDuser premium members. Start a free trial » (If you're already a premium member, log in here.) |
Addenda
Documentation toolkit
The motherlode of cheat sheets
LEEDuser’s Documentation Toolkit is loaded with calculators to help assess credit compliance, tracking spreadsheets for materials, sample templates to help guide your narratives and LEED Online submissions, and examples of actual submissions from certified LEED projects for you to check your work against. To get your plaque, start with the right toolkit.
Get the inside scoop
Our editors have written a detailed analysis of nearly every LEED credit, and LEEDuser premium members get full access. We’ll tell you whether the credit is easy to accomplish or better left alone, and we provide insider tips on how to document it successfully.
© Copyright U.S. Green Building Council, Inc. All rights reserved.
Requirements
Option 1. Transit-served location (1–4 points)
Locate any functional entry of the project within a ¼-mile (400-meter) walking distance of existing or planned bus, streetcar, or rideshare stops, or within a ½-mile (800-meter) walking distance of existing or planned bus rapid transit stops, light or heavy rail stations, commuter rail stations or ferry terminals. The transit service at those stops and stations must meet the minimums listed in Tables 1 and 2. Planned stops and stations may count if they are sited, funded, and under construction by the date of the certificate of occupancy and are complete within 24 months of that date.- Qualifying transit routes must have paired route service (service in opposite directions).
- For each qualifying transit route, only trips in one direction are counted towards the threshold.
- If a qualifying transit route has multiple stops within the required walking distance, only trips from one stop are counted towards the threshold.
Table 1. Minimum daily transit service for projects with multiple transit types (bus, streetcar, rail, or ferry)
Weekday trips |
Points |
---|---|
72 |
1 |
144 |
2 |
360 |
4 |
Table 2. Minimum daily transit service for projects with commuter rail or ferry service only
Weekday trips |
Points |
---|---|
24 |
1 |
40 |
2 |
60 |
3 |
OR
Option 2. Pedestrian access (1–4 points)
Show that the project has an attendance boundary such that the specified percentages of students live within no more than a 3/4-mile (1200-meter) walking distance (for grades 8 and below, or ages 14 and below), and 1 1/2-mile (2400-meter) walking distance (for grades 9 and above or ages 15 and above) of a functional entry of a school building. Points are awarded according to Table 3.Table 3. Points for student population within walking distance
Percentage of students |
Points |
---|---|
50% |
1 |
60% |
2 |
70% or more |
4 |
Cost estimates for this credit
On each BD+C v4 credit, LEEDuser offers the wisdom of a team of architects, engineers, cost estimators, and LEED experts with hundreds of LEED projects between then. They analyzed the sustainable design strategies associated with each LEED credit, but also to assign actual costs to those strategies.
Our tab contains overall cost guidance, notes on what “soft costs” to expect, and a strategy-by-strategy breakdown of what to consider and what it might cost, in percentage premiums, actual costs, or both.
This information is also available in a full PDF download in The Cost of LEED v4 report.
Learn more about The Cost of LEED v4 »In the end, LEED is all about documentation. LEEDuser’s Documentation Toolkit, for premium members only, saves you time and helps you avoid mistakes with:
- Calculators to help assess credit compliance.
- Tracking spreadsheets for materials purchases.
- Spreadsheets and forms to give to subs and other team members.
- Guidance documents on arcane LEED issues.
- Sample templates to help guide your narratives and LEED Online submissions.
- Examples of actual submissions from certified LEED projects.
Would a university or corporate campus shuttle service count towards this credit? The answer to this question is available to LEEDuser premium members. Start a free trial » (If you're already a premium member, log in here.) |
What’s the difference between a commuter rail, light rail, and heavy rail transit system? I’m having trouble figuring out how to categorize the different types of transit serving my project. The answer to this question is available to LEEDuser premium members. Start a free trial » (If you're already a premium member, log in here.) |
Our project is located in a place without any existing or planned formal transit networks. How can we achieve this credit? The answer to this question is available to LEEDuser premium members. Start a free trial » (If you're already a premium member, log in here.) |
What are the criteria for whether we are allowed to count future or planned transit stops? The answer to this question is available to LEEDuser premium members. Start a free trial » (If you're already a premium member, log in here.) |