Post a question or comment
Credit Filters
Filter by location
Forum
Topic
Replies
Recent

Is it possible to earn the credit with a parking garage in the underground floors?

NC-v4 LTc7:Reduced parking footprint
posted by  Benjamin Weise  on 

Hello! I am new to the topic and wondering if the project I am working on can achieve this credit.

3
Thu Dec 6, 2018, 2:29 pm

Master site development consideration

NC-v4 SSc4:Rainwater management
posted by  soha yamani  on 

Greetings , 

in LEED V4 there was an approach where I can use a master plan rain water management system . 

2
Regional Stormwater Leader
Arcadis North America
LEEDuser Expert
144 thumbs up
Thu Dec 6, 2018, 2:22 pm

Greenroofs

NC-v4 SSc4:Rainwater management
posted by  Ricardo Sá  on 

Hi,

 

We are using the "Small Storm Hydrology Method" to calculate runoff volume and using the Rv based on impervious area. The questions are:

 

2
Integrated Design & LEED Specialist
SERA Architects
LEEDuser Expert
1361 thumbs up
Thu Dec 6, 2018, 2:11 pm

Airport -Terminal- Runways must be included at the calculations?

NC-v4 SSc4:Rainwater management
posted by  Konstantina Kalliakoudi  on 

I have a project that is an Airport Terminal. The Leed boundary includes the runways. Concerning the Credit "Rainwater management": Do the runways participate at the calculations?

1
Thu Dec 6, 2018, 2:05 pm

Option 2: Parking under cover

NC-v4 SSc5:Heat island reduction
posted by  Konstantina Kalliakoudi  on 

Hello to all,

This credit requires the 75% of parking spaces under cover.

1. So this percents refers to parking spaces and not to parking area (m2/ft2), right?  

2
Sustainability Program Manager
Primus Design Services, LLC
LEEDuser Premium Member
40 thumbs up
Thu Dec 6, 2018, 12:06 pm

Main Street Program as a Priority Designation

NC-v4 LTc3:High priority site
posted by  Teresa Stern  on 

Our project is located 2 blocks from the nearest historic district, but is within the Downtown area encompassed by the local Main Street Program.

2
Sustainability Program Manager
Primus Design Services, LLC
LEEDuser Premium Member
40 thumbs up
Wed Dec 5, 2018, 2:58 pm

LEED Project Boundary on Contract Documents

NC-v4 MPR2:Must use reasonable LEED boundaries
posted by  Mark Zoeteman  on 

Is it required in v4 BD+C to show LPB on civil and architectural contract documents? Project includes renovation and addition to an existing building.

0