Quality views in nonregularly occupied spaces
NC-v4 INc1:Innovationposted by keerthana gopi on
One of our projects is a 30-storey building. The credit requires 15% of non regularly occupied floor area to have access to views.
dB & STC
NC-v4 EQc9:Acoustic performanceposted by Helena Garcia on
I'm working with a Spain Project. Spain doesn't use STC Rating, Spain assesses with dB. Can you say me what is the relation between STC and dB? How I can convert the dB into STC? Thank you.
Zero Lot line project and Heat Island Reduction
NC-v4 SSc5:Heat island reductionposted by Stephan Zweig on
Hello to all,
I have a zero lot line project, is there a a possibility to go for Option 1 (Roof and Non Roof measures) of Heat Island Reduction Credit?
Does vegetated roof need to be acessible to the building occupants
CS-v4 SSc3:Open spaceposted by Malin Folkesson on
Does the vegetated roof need to be acessible to building occupants to count towards the 25 % vegetated space?
Process energy clarification
NC-v4 EAc2:Optimize energy performanceposted by MAUDE PINTAL on
Hi,
Is heated sidewalk considered as process energy ?
Thank you,
Construction Waste Management Core and Shell and Tenant Upfit Spaces
CS-v4 MRc5:Construction and demolition waste managementposted by Summer Minchew on
Can a Core and Shell project include tenant construction debris in overall CWM calculations? Often tenant construction is concurrent with core and shell construction.
End Energy Use Cost Consumption Air Cooled Vs Water Cooled Chiller
NC-v4 EAp2:Minimum energy performanceposted by Junaid Naseer on
Dear All,
Exclusion of supporting buildings from LEED boundary?
NC-v4 MPR2:Must use reasonable LEED boundariesposted by Thomas Tan on
Dear all,
Filling out the C&D waste Calculator
NC-v4 MRc5:Construction and demolition waste managementposted by Jenelle Shapiro on
1) Are there distinct differences between material description and material type?
Credit For Demolished Concrete for use as backfill
NC-v4 MRc5:Construction and demolition waste managementposted by Chad Van Drie on
Previously, We have been a part of projects in which LEED credit has been given for the re-use of concrete, both structural and flat work, used to backfill an old gravel pit.