Off-iste reuse: donate recyclable materials to employees who need?

NC-v4 MRc5:Construction and demolition waste management
posted by  Thomas Tran  on 

Dear All,

We attempt for the MRc5 Construction and Demolition Waste Management.

2
Sustainable Consultant
INSPEC Sustainability Group LLC
LEEDuser Premium Member
43 thumbs up
Tue May 5, 2020, 1:33 am

V4 IAQ ventilation rate

CI-v4 EQp1:Minimum indoor air quality performance
posted by  Jerry Young  on 

I am working on a project using the V4 CI rating stsem. For IAQ ventialtion rate, the standard references and has the calculator for using 62.1 2010 or 2013.

0

Both Option 1 & Option 2 achievable

NC-v4 LTc3:High priority site
posted by  Muge Karasahin  on 

Hello,

Our project site qualifies both for Option 1. Historic District and Option 2. Priority Designation of the credit. Is it possible to claim two points for this credit?

3
Mon May 4, 2020, 3:11 pm

General Modeling Guidance

CI-v4 EAp2:Minimum energy performance
posted by  RDK E&S  on 

Hi, 

We are working on a project that includes 13 floors that spans a 35 story commerical building. I have a few general questions about process: 

1
Wed May 6, 2020, 8:08 pm

The project is located on land that is an Opportunity Zone.

CS-v4 LTc3:High priority site
posted by  GABRIELE Medley  on 

Opportunity Zones—meant to spur investment in undercapitalized communities. ... Does this apply to CS-v4 LTc3 - High Priority Site?

1
Mon May 4, 2020, 3:40 pm

Definition of main entrance

NC-v4 LTc6:Bicycle facilities
posted by  ABDUL MUTHALIB MOHAMED  on 

In the LEED v4 reference guide, it is given that the bicycle storage should be provided within 100' of the main entrance. Is it main entrance of the project building or project site?

5
Architect and sustainable consultant
SPACE INTERNACIONAL
LEEDuser Basic Member
1 thumbs up
Thu Apr 30, 2020, 3:06 pm

EPDM VOC content

NC-v4 EQc2:Low emitting materials
posted by  Hoda Ibrahim  on 

I would like to know if EPDM for roof has VOC content or not. As per the VOC calculator it stated that waterproof membrane limit is 250 g/l. 

4
Default Avatar
LEEDuser Premium Member
1 thumbs up
Tue Apr 28, 2020, 5:03 pm

Direct evaporative cooling contribution to EAc6

NC-v4 EAc6:Enhanced refrigerant management
posted by  Kelvin Su  on 

We are trying to pursue enhanced refrigerant management  credit for our project which is a manufacturing facility.

1
Fri Nov 20, 2020, 10:06 am