Mechanically ventilated spaces: Interior cross-contamination prevention.
NC-v4 EQc1:Enhanced indoor air quality strategiesposted by Anna Balaban on
Hi,
We are doing an office building.
Future renewable energy within the leed border
CS-v4 EAc5:Renewable energy productionposted by Instra Ingenieros on
Hi!
Innovation by earning selected credits from other LEED rating system.
NC-v4 INc1:Innovationposted by Michael J Turner on
In the Innovation credit, the guide says "Points can also be earned by achieving selected credits from other LEED rating systems."
Default light reflectance values for commodity materials?
NC-v4 EQc6:Interior lightingposted by Joanna Switzer on
Curious if anyone has had success claiming some type of Industry cited / average / worst case LRV for surface finishes such as standard poured in place concrete flooring.
Full Occupancy Calculations
EBOM-v4 EQp1:Minimum indoor air quality performanceposted by Giovani Bernal on
Our project is a 24 level office building. At least 75% of occupancy has been reached.
Excluding entrance halls from calculations
Hospitality-NC-v4 EQc7:Daylightposted by Ricardo Sá on
Dear All,
PVC Welding Cement
NC-v4 EQc2:Low emitting materialsposted by Kerry Honsinger on
Anyone come up with a PVC Welding Cement that meets the CDPH Standard Method v1.1 -2010 emissions requirement?
Short and Long Term Together?
NC-v4 LTc6:Bicycle facilitiesposted by Summer Minchew on
Can short and long term spaces be located together as long as all other requirements are met?
Bipolar Ionization devices; documenting reduced outside air quantities
Schools-NC-v4 EQp1:Minimum indoor air quality performanceposted by Kent B on
I have a new school project which currently has ionization devices throughout the HVAC RTUs. These ionization devices reduce the required outside air.
IES thermal block and baseline model with system 6
NC-v4 EAc2:Optimize energy performanceposted by Ying Lindsey on
Dear all,
I need your professional opinion about a project that I am currently working on.