Forum quick links
Total Estimated Building Annual Energy Cost
NC-v4 EAc5:Renewable energy productionposted by Alex Chapin on
Is this calculated as the gross energy cost (i.e. without reducing energy cost with the renewable energy offset) or the net energy cost?
Indoor Water Usage Prerequisite Requirements
CI-v4 WEp1:Indoor water use reductionposted by rakesh bhatia on
In the reference guide of LEED ID+C V4, it is mentioned under prerequisite the newly installed plumbing fixtures must be according to the Table 6 flow rates.
need of two excel file to show daylight compliance ?
NC-v4 EQc7:Daylightposted by Alwin Jino on
As per Version 4.1, IEQ Credit-Daylight: Options 2, Illuminance calculations.
"products that convey water for human consumption"
Healthcare-v4 MRc6:PBT source reduction - lead, cadmium and copperposted by cristina algaze beato on
Which plumbing equipment are applicable in this credit? Does this includes lavatories, kitchen sinks and showersheads? Thanks in advance.
Definition of furniture
EBOM-v4 MRc3:Purchasing - facility maintenance and renovationposted by Bo White on
How is furniture defined? I'm working on an adult education building that has large trash, recycling, and compost bins in the the classrooms since meals are regularly served.
Soil testing to document restoration
NC-v4 SSc2:Site development - protect or restore habitatposted by Beth Johannessen on
Is a soil test needed both before and AFTER construction to show that soil has been restored? We are tyring to understand how to document the restoration of the soil.
Heat Island Reduction
NC-v4 SSc5:Heat island reductionposted by Marie Bizzak on
I'm wondering if anyone knows what specifically is needed in order to get the Heat Island credit? The project has a 5 story, above ground parking garage without a roof on the top level.
EQpc116 - Daylight in nonregularly occupied spaces
NC-v4 INc1:Innovationposted by Marie Bizzak on
Can anyone please help me understand what is needed for Daylight in nonregularly occupied spaces, option 2?
https://leeduser.buildinggreen.com/credit/Pilot-Credits/EQpc116