Forum quick links
Applicability of BMS control for Multi-Occupant zones
NC-v4 EQc5:Thermal comfortposted by Gray Bender on
Hello, I am looking to understand if it would be acceptable to provide thermal comfort control only through a BMS system for a multi-occupant space.
Future development
NC-v4 SSc3:Open spaceposted by Mike Fortier on
A project I'm working on has a large undeveloped area that we'd like to include in the open space calculations and the design calls for adding the necessary features to promote physical interaction
Boarding school
NC-v4 LTc5:Access to quality transitposted by Hossam Jacoup on
?Is option 2 in Access to quality transit credit can be applied for boarding school project
Owner's Representative Sign
NC-v4 EAp3:Building-level energy meteringposted by Sofia Barahona on
Does the commitment letter be signed by the owner, which appears on the Project Details registered on LEEDOnline?
LEED Consultants working in remote mode.
NC-v4 EQc3:Construction indoor air quality management planposted by Olga Yuil on
As LEED Consultants we are working in remote mode because of COVID-19 risk.
The Project Team is concern about how this may or may not affect the certification.
Does USDA Certified Biobased Product = bio-based content?
NC-v4 MRc3:Building product disclosure and optimization - sourcing of raw materialsposted by Renee Shirey on
Has anyone had any luck claiming compliant bio-based content with a product that is certified as a "USDA Certified Biobased Product"? It looks like testing is done via ASTM test method D6866,
Option 5 - 50% recyclable content by cost
CI-v4 MRc2:Interiors life-cycle impact reductionposted by Anna McGee on
How does one prove that "...
Flooring under LEED v4 - Less stringent than LEED v3?
NC-v4 EQc2:Low emitting materialsposted by Nandan Tavkar on
For LEED v4, so long as the flooring is tested for TVOC under General Emissions Evaluation (CDPH 1.1), it appears to comply complies. It feels as if flooring under LEED v4 is less stringe
Certification Timeline for a registered Project
NC-v4 MPR3:Must comply with project size requirementsposted by Radhesh Sarkar on
Project is underconstruction and 60 % completion of gross project work. Now project is registered under LEED v4 BD+C of https://www.leedonline.com/projects.