Post a question or comment
Credit Filters
Filter by location
Forum
Topic
Replies
Recent

ASHRAE 90.1 2010 versus ASHRAE 90.1 2016

NC-v4 EAp2:Minimum energy performance
posted by  Dave Hubka  on 

LEED v4.1 allows onsite renewables to contribute to EAp Minimum Energy Performance and offsite Tier 2 renewables to contribute to EAc Optimize Energy Performance. 

6
Principal
ME Engineers
LEEDuser Basic Member
30 thumbs up
Wed Oct 13, 2021, 1:42 pm

IS "WELL WATER" AN "ALTERNATIVE WATER SOURCE"?

NC-v4 WEc1:Outdoor water use reduction
posted by  F. Borja López Calle  on 

We have a project whose landscape meets the prerequisite “WE Outdoor Water Use Reduction” (it consumes 30% less water than the base case).

3
Wed Oct 13, 2021, 1:21 pm
8
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4461 thumbs up
Tue Oct 12, 2021, 2:15 pm
4
Mon Oct 11, 2021, 1:56 pm
5
Certification Team Lead
Green Business Certification Inc. (GBCI)
LEEDuser Premium Member
11 thumbs up
Fri Oct 8, 2021, 11:01 pm

Pilot Credits - need to be successful with the Credit to earn the point?

NC-v4 INc1:Innovation
posted by  Deborah Lucking  on 

I recall reading somewhere that with LEEDv4, projects will have to be successful in the Pilot Credit to earn the point.  Is this correct.

3
Director of Sustainability
Fentress Architects
LEEDuser Expert
224 thumbs up
Fri Oct 8, 2021, 4:00 pm

Interior Space counts toward 30% of total

Healthcare-v4 SSc7:Places of respite
posted by  Maddie Spinski  on 

In the v4 handbook, the requirements read that, "such interior spaces may be used to meet up to 30% of the required area if 90% of each qualifying space's gross floor area achieves a direct line of

0

Metering for Fuel Tank

NC-v4 EAp3:Building-level energy metering
posted by  Carolyn Risley  on 

For EAp3 Building-level Energy Metering on a LEED v4 project, does a propane tank need a meter to meet the requirements of this prerequisite?  Would monthly fuel delivery invoices be sufficien

1
Thu Oct 7, 2021, 2:33 pm

CxA on the same Team

NC-v4 EAc1:Enhanced commissioning
posted by  Decorda McGee  on 

I am trying to find out if there is a situation where the CxA on a project can be a part of the same company as the deign team but has not been a part of the design effort?

3
Wed Oct 6, 2021, 5:19 am