CS-v4 SSc4:Rainwater managementposted by Simona Kabadova on
The project is situated in Sofia, Bulgaria.
Credit compliance: Contamination found on site
CS-v4 LTc3:High priority siteposted by Chen Shalita on
My project has been identified according to an ESA phase 2 - as a brownfield site.
Provide USGBC access to ENERGY STAR Portfolio Manager account
EBOM-v4 EAp2:Minimum energy performanceposted by CT G on
Hello,
modelling and presenting GSHP results
NC-v4 EAp2:Minimum energy performanceposted by Manuel Martin Delgado on
Hi,
Is Zone Outdoor Airflow meets or exceeds for all zones required?
NC-v4 EQp1:Minimum indoor air quality performanceposted by Justin Shultz on
We are working with a "Dayroom" space that has the following requirements: 4 ACH of Outdoor Air and 4 ACH of Total Air.
Mandatory MERV 11 or higher filters in existing building
NC-v4 EQp1:Minimum indoor air quality performanceposted by Francesco Passerini on
The credit requests confirmation that the project has MERV 11 or higher filters (if project is in nonattainment area for PM2.5). Is this request mandatory in existing buildings as well?
TVOC overall concentration doesn't pass but individual TVOC compounds do pass
NC-v4 EQc4:Indoor air quality assessmentposted by Valerie Johnston on
All of the individual VOC compounds in all sampling locations have passed the LEED criteria.
IAQ Documentation with Corrective Action
NC-v4 EQc3:Construction indoor air quality management planposted by Juanita Garcia on
My project team puts together reports that includes pictures of conditions that to be addressed with SMACNA Control measures and includes photos of corrected conditions.
LEED project boundary as big as 400m radius
CS-v4 LTc4:Surrounding density and diverse usesposted by Instra Ingenieros on
Dear all,