Forum quick links
Preschool child toilet rooms - no urinals
NC-v4 WEp2:Indoor water use reductionposted by Lyle Axelarris on
I'm working on a child care center project, with many toilet rooms designed for preschool-aged children. Since urinals are not appropriate for this occupancy type, should I consider these res
Base building energy sources
CS-v4 EAc3:Advanced energy meteringposted by Ciaran McCabe on
Hi, I just require come clarification on the Base Build systems.
District heating and Cooling
NC-v4 EAp2:Minimum energy performanceposted by Greenlab on
Hello Everyone,
OA Flow to enter in MEPC
CS-v4 EAp2:Minimum energy performanceposted by Vassil Vassilev on
Greetings,
We are facing the following issue, for which we’d need some assistance/advice.
In- or exclude energy use of servers (tenants) in C&S for a datacenter
CS-v4 EAc2:Optimize energy performanceposted by Janine van den Kerkhof on
We are targeting LEED certification for a new Datacenter. Since there are no tenant agreements yet, we using the Core & Shell scheme.
Is drywall not considered a product for LEED V4 ?
NC-v4 MRc2:Building product disclosure and optimization - environmental product declarationsposted by Sara BENLOUBA on
Hello dears,
Is plasterboard / Drywall not considered a product for LEED V4 ?
This is what I understood from the LEED guide, page 469,
is drywall not considered a product for LEED V4?
NC-v4 MRc4:Building product disclosure and optimization - material ingredientsposted by Sara BENLOUBA on
Hello Dears,
Is plasterboard / Drywall not considered a product for LEED V4 ?
This is what I understood from the LEED guide, page 469,
Minimum Energy Performance Review Phase
CS-v4 EAp2:Minimum energy performanceposted by Eric Kim on
Hello,
I have a question about the project review.
Our project was conducted by Spilt Review.
Tenant water metering
CS-v4 WEc4:Water meteringposted by Anya Fiechtl on
Can a Core&Shell project achieve this credit by submetering tenant water use?
Is proof of 3rd party Cx of Renewable Energy installations required?
NC-v4 EAc5:Renewable energy productionposted by Joyce Kelly on
Proof of 3rd party Cx was requested by a Reviewer in a 2009 project. I'm no longer seeing this mentioned in v4... or is it implicit?