Forum quick links
Modeling a warehouse that is divided into multiple typical units
CS-v4 EAc2:Optimize energy performanceposted by Michael on
My project is a big dry warehouse, which is divided into 7 typical units for future tenants. There is a small office with AC in each unit.
RECs for project supplied by campus central utility plant?
NC-v4 EAc7:Green power and carbon offsetsposted by Erin Holdenried on
Can RECs be used for project located on a campus with a central plant that generates its own electricity for the campus? It is a cogen plant that also supplies steam and chilled water.
Low Emitting Materials Calculator and Precast Wall Panels
NC-v4 EQc2:Low emitting materialsposted by Teaaron Frye on
In regards to the low emitting materials calculator (v4.1) what is the proper way to document insulated and non-insulated precast concrete wall panels.
HVAC limited scope of works
NC-v4 EAp2:Minimum energy performanceposted by Nikos Tsitsikas on
Hi everyone,
Definition of "one building"
CS-v4 MPR2:Must use reasonable LEED boundariesposted by James Jin on
Hi all,
Credit compliance requirement for LEED V4 - Option 1
CI-v4 EQc7:Daylightposted by Anshuman Vashistha on
We have a CI project attempting the daylight credit through option 1 - sDA and ASE simulation as per LEED.
Waste materials and Recycling Records
EBOM-v4 MRc4:Solid waste management - ongoingposted by DAVE LI on
Can the waste and recycling records be filled in by internal staff or must be provided by the recycling manufacturer and signed?
ASHRAE 90.1 all electric baseline?
NC-v4 EAp2:Minimum energy performanceposted by Kevin Gilleran on
Hi all,
Situation:
LT:Reduced Parking Footprint
CS-v4 LTc7:Reduced parking footprintposted by Mark Yuschak on
Working on this credit in an urban setting (NYC) with no parking available by the building ( street parking only) and meeting Surrounding Density and Access to Quality Transit, how can you sho