Forum quick links
Replacement for the demolished walls
CI-v4 MRc2:Interiors life-cycle impact reductionposted by Simon Sue on
In a CI tenant finish-out, if existing interior partitions are demolished and new interior partitions are constructed in an original configuration (not matching to the demolished partition lay
Reuse furniture cost
CI-v4 MRc2:Interiors life-cycle impact reductionposted by pradeep kumar on
We are doing the project in which our client reusing the furniture from their existing office to the new office. Furniture comprises of wooden tables, chairs etc.
How to demonstrate the materials are reusable or recycable?
CI-v4 MRc2:Interiors life-cycle impact reductionposted by Ameet AA on
The LEED language reads:
Furniture Reuse vs. Building Product Disclosure and Optimization— Sourcing of Raw Materials "Materials Reuse"
CI-v4 MRc2:Interiors life-cycle impact reductionposted by Kristen Magnuson on
Hello LEED world,
Tracking re-used materials - Exterior walls.
CI-v4 MRc2:Interiors life-cycle impact reductionposted by Kerry Honsinger on
We are working on a building where the exterior walls are going to be changed very little. I have a question about the '3 layers" and the "SCOPE OF WORK".
Option 1. interior reuse
CI-v4 MRc2:Interiors life-cycle impact reductionposted by DAVE LI on
I have space is use the glass for the compartment. Is this belong Interior wall partition?
Option 3. design for flexibility- Acessible ceiling system
CI-v4 MRc2:Interiors life-cycle impact reductionposted by Lara Branco on
The project I'm working on will leave all the ceiling infrastructure apparent, without the use of ceiling tiles (except a few acoustic panels). Therefore all the lighting, plumbing, etc.
Flexible Power Distribution
CI-v4 MRc2:Interiors life-cycle impact reductionposted by roma goyal on
Hello,
I would like to know e=waht does 'flexible power distribution i.e. plug and play system' mean?
what are the equipments to be considered for this system?
Accessible Floor and Ceiling system
CI-v4 MRc2:Interiors life-cycle impact reductionposted by roma goyal on
Hello,
I would like to know what does "accesible floor and ceiling system" mean?
Does it mean suspended ceiling system and raised floor system for 50% of the total floor area.
Take back program language for contract
CI-v4 MRc2:Interiors life-cycle impact reductionposted by Brightworks Sustainability on
Does anyone have a sample contract with a manufacturer for a take back program? My project teams are asking about this and we are not sure who the responsibility falls on - owner? GC?