Waste category as "construction & Demolition waste"
NC-v4 MRp2:Construction and demolition waste management planningposted by Adam Insan on
One of project located in KSA following construction waste management credit targeting 2 points with 75% diversion as per option 2.
Contaminated Soil
NC-v4 MRp2:Construction and demolition waste management planningposted by Magdalena Kolodziej Rivas on
If a project has a small area of contaminated soil, how should that be incorporated into the Waste Management and Erosion and Sedimentation Plan.
If sub-ing all NC-v4.1 for MR credits, then is NCv4-MRp2 still required if registered as v4?
NC-v4 MRp2:Construction and demolition waste management planningposted by Laura Stanley on
Has anyone encountered this situation, and been allowed to skip the MRp2 credit since it was omitted in NC-v4.1 in 11/2020?
CONSTRUCTION WASTE HEATED FOR CLINKER PRODUCTION, COUNTED AS WASTE DIVERSION?
NC-v4 MRp2:Construction and demolition waste management planningposted by Olga Yuil on
For a project located in Central America, construction waste is used for clinker production. For this purpose, construction waste is heated to temperatures above 900C.
CDWM - Recycling Facility Diversion Rate
NC-v4 MRp2:Construction and demolition waste management planningposted by Preethi Sreeraj on
It is clear from the guidance that a project will need the diversion rate of the Comingled facility that is regulated by local or state agency, but is this applicable for source separated wast
Waste management plan submission with multiple GC's
NC-v4 MRp2:Construction and demolition waste management planningposted by Blake Weaver on
I am working on a multiphase project where each phase has dramatically different scopes of work for the project and each has a different GC.
Two separate buildings / 2 waste haulers / 1 report
NC-v4 MRp2:Construction and demolition waste management planningposted by Allison Para on
Hello Users,
CWM Plan for Only Commingled Diversion
NC-v4 MRp2:Construction and demolition waste management planningposted by Michelle Rosenberger on
My project has decided not to pursue any source separation and will only use commingled waste. They will of course forgo the credit.
Contaminated material in a bulldozer demolition
NC-v4 MRp2:Construction and demolition waste management planningposted by Priscillia Champagne on
Hi LeedUser,
How many type of C & D waste to be recycled
NC-v4 MRp2:Construction and demolition waste management planningposted by Osman Faroq on
Dear all,
Good Day,