Forum quick links
renewable energy sold to the grid
NC-v4 EAc2:Optimize energy performanceposted by Francesco Passerini on
In order to calculated the points relative to NC-v4 EAc2 - Optimize energy performance shall the produced electric energy from a renewable source that is sold to the national gri
Elevators
NC-v4 EAc2:Optimize energy performanceposted by John McCullough on
I have managed to create a rather impressive energy reduction between the baseline and proposed elevators.
EAc1 baseline and proposed systems
NC-v4 EAc2:Optimize energy performanceposted by John McCullough on
The problem I am having is that I have to select a system for the baseline model which is System 7 VAV with Reheat, based on the advise of ASHRAE Table G3.1.1A , however the proposed system for the
How many points can be claimed if project is served with 100% Renewable Energy for EAC1?
NC-v4 EAc2:Optimize energy performanceposted by Ashraf Ali Khan Khan on
How many points can be claimed if project is served with 100% Renewable Energy?
LEED v4 projects that demonstrate compliance using ASHRAE 90.1-2013
NC-v4 EAc2:Optimize energy performanceposted by Vina Vales on
Is there a different Table 1: ASHRAE 90.1-2013 Appendix G percentage Improvement that we can use for those projects under LEED v4 but using ASHRAE 90.1-2013?
If so, please forward.
Energy Star appliances in LEED v4
NC-v4 EAc2:Optimize energy performanceposted by Eesmyal Santos-Brault on
Is there a CIR on modeling energy star appliances in LEED v4? Can we claim energy savings for using energy star appliances in LEED v4?
Modeling system serving both HVAC and Process
NC-v4 EAc2:Optimize energy performanceposted by Visu Boj on
We are doing certification for a beverage factory. The factory requires chilled water for process load that is served by 2*1080 kW Evaporatively cooled Screw chillers.
Alternative Compliance Path
NC-v4 EAc2:Optimize energy performanceposted by Gabriela Mena on
Hi, We are working in a Core and Shell project that was registered after april, 2016, from that date to comply with the pre requisite we need to achieve at least 14% savings, We want to know if th
New and Renovation: How to Determine Points from Table 1
NC-v4 EAc2:Optimize energy performanceposted by James Keohane on
I am working on a project that is approx. 24,600sf which includes 11,600s.f. of major renovation with 13,000s.f new construction.