Indoor plumbing fixtures and fittings only?
NC-v4 WEc4:Water meteringposted by Amgad Khattab on
f the only subsystem available in the project is (Indoor plumbing fixtures and fittings), Are we eligible to earn this Credit for a core and shell project?
process water - restaurant?
NC-v4 WEc4:Water meteringposted by Agnieszka Rylska on
We have a New construction project - offices with a restaurant on the groud floor. Does anyone know if water use for the purpose of the restaurant can be considered process water?
heat pump
NC-v4 WEc4:Water meteringposted by Francesco Passerini on
In order to achieve this credit, permanent water meters can be installed also for "Boiler with aggregate projected annual water use of 100,000 gallons (378 500 liters) or more, or boiler of mo
Simple buildings with only restroom fixtures and irrigation
NC-v4 WEc4:Water meteringposted by Susan Di Giulio on
I have this question for several university projects: the only water interior use in the buildings is restrooms.
80% - how to determine 80% of flush and flow fixtures
NC-v4 WEc4:Water meteringposted by Sue Bryant on
The requirement is to meter 80% indoor plumbing fixtures and fittings as described in WEp Indoor Water Use reduction: lavs, toilets, urinals, showers.
Dmestic Hot Water heating "capacity"?
NC-v4 WEc4:Water meteringposted by Karen Joslin on
I'm surrounded by really smart mech engineers and we need clarification about how to measure the total combined heating capacity.
Submetering Process Water - Assisted Living laundry
NC-v4 WEc4:Water meteringposted by Jennifer Rennick on
I'm working on an assisted living facility that will have laundry machines in just a few of their residential units, but generally have a central laundry facility for the building.
Is installing more than one water meter per subsystem ok?
NC-v4 WEc4:Water meteringposted by Pablo Muñoz on
The credit is not specific enough (as it is in the energy metering credit).
Metering make-up water for geothermal system
NC-v4 WEc4:Water meteringposted by Daniel Davis on
We are installing a meter onto the geothermal well water makeup water (due to evaporation/leakage) – will this count as the additional meter, under process water?