Forum quick links
Recommended Specs for Commercial Washing Machines?
NC-v4 WEp2:Indoor water use reductionposted by Annalise Dum on
Hello! We are having a FIELD DAY trying to find a compliant commercial washing machine for our hotel project.
evaporative cooling in AHU
NC-v4 WEp2:Indoor water use reductionposted by Arwid Theuer-Kock on
Hi community,
Exempt from Indoor Water Efficiency pre-requisite?
NC-v4 WEp2:Indoor water use reductionposted by Lawrence Lile on
We have a project that includes no bathrooms, kitchens, or other indoor water use. There is an industrial process that uses water, which we will address separately. Can we claim exempti
Indoor Water Use Reduction Calculator for Hotels
NC-v4 WEp2:Indoor water use reductionposted by on
I am working on a 5 story hotel in San Jose, California. I'm trying to finalize the Indoor Water Use Reduction Calculator. The water closets (4 types) have identical gpf rates, so
WEp2 - add shower to awarded credit
NC-v4 WEp2:Indoor water use reductionposted by A&L SUSTENTABILIDADE on
During the Design Review, we have submitted the LT pre-requisite/credit Indoor Water Use Reduction and we have earned a total of 6 points.
WEp2c2 Indoor Water - calculating urinal access for multiple single user WCs
NC-v4 WEp2:Indoor water use reductionposted by Susan Di Giulio on
Our project is a machine/model-making shop in an art and design college. There are 4, ungendered, single-user bathrooms that all occupants have access to (no other bathrooms).
Does the project scope for kitchen appliances include future tenants?
NC-v4 WEp2:Indoor water use reductionposted by Christoph Keck on
Hi guys,
Interior Irrigation?
NC-v4 WEp2:Indoor water use reductionposted by Allison Wilson on
Our project has interior planting which will be irrigated.
New WaterSense requirements don't align with LEED v4
NC-v4 WEp2:Indoor water use reductionposted by Bethany Beers on
Has anyone explored the discrepancy that has been created by the new WaterSense requirements for flush fixtures at 1.28 gpf minimum?
Existing Cooling Towers and Evaporative Condensers Prerequisite
NC-v4 WEp2:Indoor water use reductionposted by Green Projects on
For a new construction building tying into existing utility plant located outside of the LEED project boundry and scope of the new construction.