Forum quick links
Airports and LTc2
NC-v4 LTc2:Sensitive land protectionposted by Konstantina Kalliakoudi on
Hello to all,
I have an airport which will be located in a place were today there are olive groves and vineyards land.
Greenfield with Underground Utilities
NC-v4 LTc2:Sensitive land protectionposted by Cathal Heneghan on
Hi all
My project is a green field site apart from utility services (water and electric) which run underground through a portion of the site for neighbouring buildings.
Does a remediated Ash basin qualify for LTc2...?!
NC-v4 LTc2:Sensitive land protectionposted by Olawale Taiwo on
My project is sited on a land mass which happens to be a remediated ash basin site on a facility which is now being transformed into a gas powered plant ( from a coal plant) and has now transformed
Site vegetated when project started; however it was previously developed
NC-v4 LTc2:Sensitive land protectionposted by Helen Kessler on
Our v4 project is on a site that previously had a housing development. This development was removed some time ago and the land now has grass and trees. We would like to say it was previ
Allowed minor improvents
NC-v4 LTc2:Sensitive land protectionposted by soha yamani on
what the word clearings mean in the allowed minor improvement section for water bodies and wetlands ?
Previously Developed AND Wetlands
NC-v4 LTc2:Sensitive land protectionposted by Becky Johnson on
My building is being constructed on previously developed land, however there is a strip of jurisdictional wetlands on site that we are relocating.
Distance from water bodies and wet lands
NC-v4 LTc2:Sensitive land protectionposted by Bazeeth Ahamed K M on
In V3, the development boundary from water bodies and wetlands should be 50' and 100' respectively. Why in V4 it is reversed ie 100' for water bodies and 50' for wetland? Any justification?
Platted Lots by Government
NC-v4 LTc2:Sensitive land protectionposted by soha yamani on
Dear All, If a project lies on a platted plot specified by government (surrounded by streets from four or three sides ) in a desert land : is this considered previously developed plot ?
NC-v4 LTc2: Sensitive land protection/Wetland Protection
NC-v4 LTc2:Sensitive land protectionposted by Robyn Dowsey on
Is there a precedent anywhere for getting this credit with wetland mitigation plan where small inactive wetlands were included in the project footprint but an equal or greater wetland area was purc