Is Water considered a recycled material ?

CS-2009 MRc4:Recycled Content
posted by  Ines Fischer  on 

Hello everyone!

I have some concrete cutsheets where it is specified that 30% of the water used fot it´s mixing was recycled. 

0

Removing "other" costs from total construction cost of project

CS-2009 MRc4:Recycled Content
posted by  Edgar Arevalo  on 

I am looking at a spreadsheet with the total construction cost for the project.  I already shaved off HVAC, Electrical, Plumbing, and other equipment costs from the total (including audiovisua

0

Percentage Range

CS-2009 MRc4:Recycled Content
posted by  Edgar Arevalo  on 

This is a bit bothersome.  I received 2 submittals where the postconsumer and/or preconsumer range where added as percentage range like "11% to 18%" rather than a fixed percentage value.&

6
Default Avatar
Principal
LSDesignworks @ Vancouver, BC Canada
LEEDuser Basic Member
9 thumbs up
Wed Dec 12, 2018, 5:08 pm

Default materials cost

CS-2009 MRc4:Recycled Content
posted by  Agnieszka Rylska  on 

LEED default materials cost is 45% of total construction costs (based on specific Master Format divisions).

3
Tue Aug 28, 2018, 8:40 am

Paints and Coating

CS-2009 MRc4:Recycled Content
posted by  Edgar Arevalo  on 

I've been searching through the reference guide but I cannot find a direct answer.  My question is, can we also catalog paints and coatings into the Materials and Resources Calculator?&nb

3
Energy Engineer
ads ENGINEERS, DPC
LEEDuser Basic Member
21 thumbs up
Thu Jan 4, 2018, 10:09 pm

Paint and coating

CS-2009 MRc4:Recycled Content
posted by  Edgar Arevalo  on 

I've been searching through the reference guide but I cannot find a direct answer.  My question is, can we also catalog paints and coatings into the Materials and Resources Calculator?&nb

1
Fri Jan 12, 2018, 12:55 am

Total construction cost

CS-2009 MRc4:Recycled Content
posted by  Agnieszka Rylska  on 

Should the excavation work cost be included in the total contruction cost (while using the default cost of materials equal to 45% of total construction costs)?

3
Wed Sep 13, 2017, 3:01 pm

MRc4 Recycled Content

CS-2009 MRc4:Recycled Content
posted by  Christine Castellano  on 

Hi - a masonry subcontractor provided me with the total cost of the CMU block, however, he broke out the recycled content of each component of the CMU, i.e., he gave me the % of cement, fly ash, re

1
Thu Jun 19, 2014, 1:43 pm

Project Costs

CS-2009 MRc4:Recycled Content
posted by  Sara Neff  on 

Hello, I have a question about construction costs to calculate the recycled content value of my LEED project.

1
Fri Apr 22, 2011, 12:54 am

Site Fill as Regional/Recycled Material...

CS-2009 MRc4:Recycled Content
posted by  Rick Alfandre  on 

Looking to confirm: We are using subgrade Fill for our building project that was procured from an on-site location.

1
Sat Aug 26, 2017, 11:09 pm