Is Water considered a recycled material ?
CS-2009 MRc4:Recycled Contentposted by Ines Fischer on
Hello everyone!
I have some concrete cutsheets where it is specified that 30% of the water used fot it´s mixing was recycled.
Removing "other" costs from total construction cost of project
CS-2009 MRc4:Recycled Contentposted by Edgar Arevalo on
I am looking at a spreadsheet with the total construction cost for the project. I already shaved off HVAC, Electrical, Plumbing, and other equipment costs from the total (including audiovisua
Percentage Range
CS-2009 MRc4:Recycled Contentposted by Edgar Arevalo on
This is a bit bothersome. I received 2 submittals where the postconsumer and/or preconsumer range where added as percentage range like "11% to 18%" rather than a fixed percentage value.&
Default materials cost
CS-2009 MRc4:Recycled Contentposted by Agnieszka Rylska on
LEED default materials cost is 45% of total construction costs (based on specific Master Format divisions).
Paints and Coating
CS-2009 MRc4:Recycled Contentposted by Edgar Arevalo on
I've been searching through the reference guide but I cannot find a direct answer. My question is, can we also catalog paints and coatings into the Materials and Resources Calculator?&nb
Paint and coating
CS-2009 MRc4:Recycled Contentposted by Edgar Arevalo on
I've been searching through the reference guide but I cannot find a direct answer. My question is, can we also catalog paints and coatings into the Materials and Resources Calculator?&nb
Total construction cost
CS-2009 MRc4:Recycled Contentposted by Agnieszka Rylska on
Should the excavation work cost be included in the total contruction cost (while using the default cost of materials equal to 45% of total construction costs)?
MRc4 Recycled Content
CS-2009 MRc4:Recycled Contentposted by Christine Castellano on
Hi - a masonry subcontractor provided me with the total cost of the CMU block, however, he broke out the recycled content of each component of the CMU, i.e., he gave me the % of cement, fly ash, re
Project Costs
CS-2009 MRc4:Recycled Contentposted by Sara Neff on
Hello, I have a question about construction costs to calculate the recycled content value of my LEED project.
Site Fill as Regional/Recycled Material...
CS-2009 MRc4:Recycled Contentposted by Rick Alfandre on
Looking to confirm: We are using subgrade Fill for our building project that was procured from an on-site location.