Log in
Forum
Topic

Concrete Curing Systems

NC-2009 IEQc4.1: Low-emitting materials - adhesives and sealants
posted by Tim Rogers on Aug 24, 2010, 11:19 am

We have an issue where a concrete curing application is being used on the concrete BEFORE the weatherproofing system is in place, and before the building is closed-in. As a wet product, the VOCs...

Last reply: Mara Baum, Aug 24, 2010, 11:52 am

Classifying Products

NC-2009 IEQc4.2: Low-emitting materials - paints and coatings
posted by Adolfo Silva on Feb 24, 2010, 10:03 am

Hello,

I'm working on a project and the...

Last reply: Mara Baum, Aug 23, 2010, 2:47 pm

Perplexing Reference Guide language for Table 1, SCAQMD Rule 111

NC-2009 IEQc4.2: Low-emitting materials - paints and coatings
posted by Mara Baum on Feb 8, 2010, 4:47 pm

2004. Please look into registering for LEEDUser (LEEDUser.com) where there are dicsussion forums that address inquiries such as yours."--Funny, I end up posting the answer to this question...

Last reply: Mara Baum, Aug 23, 2010, 12:47 pm

Re: Recycling System

General forums
posted by David Posada on Aug 19, 2010, 7:03 pm

I don't think this method has a good chance of being accepted. I'm guessing the reviewers would say it relies too much on the users to correctly bag and label the different items, and is too...

Last reply: David Posada, Aug 23, 2010, 11:56 am

Supporting documentation for IEQ P1

NC-2009 IEQp1: Minimum indoor air quality performance
posted by Bob Richardson on Aug 12, 2010, 8:03 am

I'm working on a system with heat pumps and...

Last reply: Roger Chang, Aug 23, 2010, 9:20 am

Lighting requirements of Ashrae 90.1-2007

CI-2009 EAp2: Minimum Energy Performance
posted by Gahl Sorkin Spanier on Aug 20, 2010, 12:22 pm

Achieving the minimum Ashrea 90.1-2007 requirement for lighting power...

Last reply: John Bauer, Aug 22, 2010, 12:15 am

Underground Parking

EBOM-2009 SSc7.1: Heat island effect - nonroof
posted by Drew Wenzel on Aug 2, 2010, 4:50 pm

I'm working on a project where about 75% of our parking is located under the building itself. The LEED manual says there is "no...

Last reply: Jacob Arlein, Aug 20, 2010, 5:57 pm

Re-calibration & corrective action

NC-2009 EAc5: Measurement and Verification
posted by Jenny Stadelmann on Aug 20, 2010, 2:27 pm

Does the re-calibration of the as-built design energy model and the baseline model need to be done monthly during the 12 mos. M&V period, and then corrective action taken monthly based on how...

Last reply: Marcus Sheffer, Aug 20, 2010, 3:15 pm

restaurant equipment

CS-2009 EAp2: Minimum Energy Performance
posted by Diana Wellenbrink on Aug 18, 2010, 11:14 pm

Should future restaurant equipment be enluded in the calcs?

Last reply: Marcus Sheffer, Aug 20, 2010, 3:08 pm

open space requirement

NC-2009 SSc5.2: Site development - maximize open space
posted by Matthew VanSweden on Aug 19, 2010, 11:50 am

in a...

Last reply: David Posada, Aug 20, 2010, 2:25 pm