Does the re-calibration of the as-built design energy model and the baseline model need to be done monthly during the 12 mos. M&V period, and then corrective action taken monthly based on how close the historical data is to the modeled data, or does the building just wait until 12 mos. of data is collected and then go through the re-calibration of the two models and "corrective action" taken? If it's the latter case, then is the only requirement DURING the 12 mos. performance period to collect the energy usage data, whether through meters or through other variables from which the energy use of systems can be calculated?