Topic | Recent |
---|---|
Views for tennacies in CSCS-2009 IEQc8.2: Daylight and views - viewsposted by Ricardo Sobral on Jul 21, 2010, 2:59 pm
I would like to know if spaces for leasing, which are not part of the core & shell of the building, are requiered to have access to views, specially tennancies for commercial retail at ground... Last reply: Tristan Roberts, Jul 24, 2010, 12:33 am |
|
Designating a CxASchools-2009 EAp1: Fundamental Commissioning of Building Energy Systemsposted by Terry Squyres on Jul 21, 2010, 12:41 pm
Does the... Last reply: Tristan Roberts, Jul 24, 2010, 12:20 am |
|
looking for this in LEED Reference GuidesGeneral forumsposted by Tristan Roberts on Jul 24, 2010, 12:16 am
Patrick, where are you seeing this? I'm looking at page 370 of the BD&C Reference Guide, and page 244 of the ID&C Reference Guide, and seeing them both reference ISO 14021. Both are LEED... |
|
A Unique Situation for an AdditionNC-2009 SSc7.1: Heat island effect - nonroofposted by Michael Kros on Jul 22, 2010, 2:27 pm
We are working on getting an addition certified under version 3.0 that is being added onto an original... Last reply: Michael Kros, Jul 23, 2010, 3:13 pm |
|
E1 E0 woodCI-2009 IEQc4.4: Low-emitting materials - composite wood and agrifiber productsposted by Vivian Wan on Jul 23, 2010, 4:01 am
do you know whether E1 and E0... Last reply: Tristan Roberts, Jul 23, 2010, 11:00 am |
|
Should I consider in this Prerequisite also the Restrooms?NC-2009 IEQp1: Minimum indoor air quality performanceposted by Claudia Rieger on Jul 8, 2010, 2:07 pm
Hi everybody, Now, let´s go to the question, I have a single... Last reply: Carrie Lai, Jul 22, 2010, 10:43 pm |
|
Rated PowerCI-2009 EAc1.4: Optimize energy performance - equipment and appliancesposted by Victoria Lockhart on May 18, 2010, 9:48 am
not sure if im understanding the Reference Guide correctly: for the calculation do we use the default values for... Last reply: Paul Conrad, Jul 22, 2010, 11:17 am |
|
Air Testing CriteriaNC-2009 IEQc3.2: Construction IAQ management plan - before occupancyposted by Vivian Wan on Jul 22, 2010, 2:29 am
Is there any guideline to the sampling criteria such as the measurement interval during the normal occupied hours? In Hong Kong the sampling period required by Env. Dept is on 8-hour basis with... Last reply: Allison Beer McKenzie, Jul 22, 2010, 8:13 am |
|
BAS- Lighitng Control for Hotel SpacesEBOM-2009 EAc3.1: Performance measurement - building automation systemposted by Ashu Gupta on Jul 13, 2010, 6:12 am
Is it necessary to integrate the entire lighting to BMS such as Hotel lobby lighting, corridor lighting which is always ON (24*7)? Also should guest rooms lighting integrate to BMS or not... Last reply: Pierce Holstrom, Jul 21, 2010, 6:17 pm |
|
EBOM change from 1993 to 1994 for WEp1/WEc2General forumsposted by Peter Dahl on Jul 21, 2010, 3:00 pm
Also note that the July 19 addenda shifted the pre-/post-1993 fixture baseline to pre-/post-1994. Though this will only affect buildings with plumbing systems installed during 1993 or 1994, the... |