Also note that the July 19 addenda shifted the pre-/post-1993 fixture baseline to pre-/post-1994. Though this will only affect buildings with plumbing systems installed during 1993 or 1994, the change provides a significant advantage for a 1994 building pursuing LEED-EB O&M.