Log in
Forum
Topic

SS1 Path 11 On-site Renewable Energy

CI-2009 SSc1: Site Selection
posted by Timothy Fry on Nov 4, 2010, 3:54 pm

The building we are outfitting has Solar PV on site, an estimated 17,800kWh annual production. Half of it feeds a DC power Hydrogen electrolyzer that is used within the building and the other...

Last reply: Tristan Roberts, Nov 12, 2010, 10:42 pm

Controller Efficiency (CE) data

NC-2009 WEc1: Water Efficient Landscaping
posted by eileen hughes on Nov 3, 2010, 7:16 pm

I am having trouble obtaining manufacterers documentation for the following:
Upload WEc1-2. Provide manufacturer documentation or calculations to
support the Controller Efficiency (CE...

Last reply: Amy Rider, Nov 12, 2010, 7:52 pm

50% FSC

EBOM-2009 MRc1: Sustainable purchasing - ongoing consumables
posted by Simon Sue on Nov 3, 2010, 5:32 am

one of the requirement that project owner can approach is to purchase product consists of 50%...

Last reply: Tristan Roberts, Nov 12, 2010, 6:13 pm

Engineered or laminated wood flooring

Schools-2009 IEQc4.3: Low-Emitting Materials—Flooring Systems
posted by Jan Stensland on Nov 3, 2010, 2:30 pm

For LEED for Schools, could an engineered or laminated...

Last reply: Tristan Roberts, Nov 12, 2010, 4:08 pm

Template Needed for CS WEp1

CS-2009 WEp1: Water Use Reduction
posted by Craig Sheehy on Nov 3, 2010, 2:00 pm

Does anybody have a blank CS WEp1 template with the correct public lavatory sink flow rate (.5) in the baseline table? I do not have any new CS projects registered but need to evaluate a...

Last reply: Tristan Roberts, Nov 12, 2010, 4:06 pm

Bus Stop Frequency

NC-2009 SSc4.1: Alternative transportation - public transportation access
posted by Jena Lester on Nov 12, 2010, 1:16 pm

I'm am working on a project that has (2) bus lines that service the site that are both within a 1/4 mile radius. One line has an all day service route scheduled and the other only has rush hour...

Last reply: Tristan Roberts, Nov 12, 2010, 1:44 pm

Option 4 for non residential project 2003 ITE study

NC-2009 SSc4.4: Alternative transportation - parking capacity
posted by Florian Schmidtchen on Nov 7, 2010, 11:05 pm

I am working on a production facility located in China with no local zoning requirements regarding the parking capacity.
I am wondering if we could go for option 4 by providing 25% less...

Last reply: Tristan Roberts, Nov 12, 2010, 12:12 pm

out buildings and LEED

General forums
posted by Tristan Roberts on Nov 11, 2010, 9:32 pm

Sean, since these are in your LEED boundary they should be considered for all relevant LEED credits—which will be most of them. Since they're small and unoccupied, I don't think you need to...

Last reply: Cara Mae Cirignano, Nov 12, 2010, 12:11 pm

Campus Recycling

Schools-2009 MRp1: Storage and Collection of Recyclables
posted by Tim Hoeft on Nov 9, 2010, 9:16 am

Our project is on a community college campus that has a dedicated recycling area for the campus that is not within our LEED project area. Is it acceptable to reference this area in the narrative...

Last reply: Tristan Roberts, Nov 12, 2010, 11:54 am

Guest room in Hotels

EBOM-2009 IEQc2.4: Daylight and Views
posted by Ashu Gupta on Jun 11, 2010, 12:57 am

In our hotel project the workspace of all permanent employees is in basement which does not meet the requirement of this credit. but if we include the guest rooms which having the more window...

Last reply: Tristan Roberts, Nov 12, 2010, 11:49 am