Topic | Recent |
---|---|
SS1 Path 11 On-site Renewable EnergyCI-2009 SSc1: Site Selectionposted by Timothy Fry on Nov 4, 2010, 3:54 pm
The building we are outfitting has Solar PV on site, an estimated 17,800kWh annual production. Half of it feeds a DC power Hydrogen electrolyzer that is used within the building and the other... Last reply: Tristan Roberts, Nov 12, 2010, 10:42 pm |
|
Controller Efficiency (CE) dataNC-2009 WEc1: Water Efficient Landscapingposted by eileen hughes on Nov 3, 2010, 7:16 pm
I am having trouble obtaining manufacterers documentation for the following: Last reply: Amy Rider, Nov 12, 2010, 7:52 pm |
|
50% FSCEBOM-2009 MRc1: Sustainable purchasing - ongoing consumablesposted by Simon Sue on Nov 3, 2010, 5:32 am
one of the requirement that project owner can approach is to purchase product consists of 50%... Last reply: Tristan Roberts, Nov 12, 2010, 6:13 pm |
|
Engineered or laminated wood flooringSchools-2009 IEQc4.3: Low-Emitting Materials—Flooring Systemsposted by Jan Stensland on Nov 3, 2010, 2:30 pm
For LEED for Schools, could an engineered or laminated... Last reply: Tristan Roberts, Nov 12, 2010, 4:08 pm |
|
Template Needed for CS WEp1CS-2009 WEp1: Water Use Reductionposted by Craig Sheehy on Nov 3, 2010, 2:00 pm
Does anybody have a blank CS WEp1 template with the correct public lavatory sink flow rate (.5) in the baseline table? I do not have any new CS projects registered but need to evaluate a... Last reply: Tristan Roberts, Nov 12, 2010, 4:06 pm |
|
Bus Stop FrequencyNC-2009 SSc4.1: Alternative transportation - public transportation accessposted by Jena Lester on Nov 12, 2010, 1:16 pm
I'm am working on a project that has (2) bus lines that service the site that are both within a 1/4 mile radius. One line has an all day service route scheduled and the other only has rush hour... Last reply: Tristan Roberts, Nov 12, 2010, 1:44 pm |
|
Option 4 for non residential project 2003 ITE studyNC-2009 SSc4.4: Alternative transportation - parking capacityposted by Florian Schmidtchen on Nov 7, 2010, 11:05 pm
I am working on a production facility located in China with no local zoning requirements regarding the parking capacity. Last reply: Tristan Roberts, Nov 12, 2010, 12:12 pm |
|
out buildings and LEEDGeneral forumsposted by Tristan Roberts on Nov 11, 2010, 9:32 pm
Sean, since these are in your LEED boundary they should be considered for all relevant LEED credits—which will be most of them. Since they're small and unoccupied, I don't think you need to... Last reply: Cara Mae Cirignano, Nov 12, 2010, 12:11 pm |
|
Campus RecyclingSchools-2009 MRp1: Storage and Collection of Recyclablesposted by Tim Hoeft on Nov 9, 2010, 9:16 am
Our project is on a community college campus that has a dedicated recycling area for the campus that is not within our LEED project area. Is it acceptable to reference this area in the narrative... Last reply: Tristan Roberts, Nov 12, 2010, 11:54 am |
|
Guest room in HotelsEBOM-2009 IEQc2.4: Daylight and Viewsposted by Ashu Gupta on Jun 11, 2010, 12:57 am
In our hotel project the workspace of all permanent employees is in basement which does not meet the requirement of this credit. but if we include the guest rooms which having the more window... Last reply: Tristan Roberts, Nov 12, 2010, 11:49 am |