The building we are outfitting has Solar PV on site, an estimated 17,800kWh annual production. Half of it feeds a DC power Hydrogen electrolyzer that is used within the building and the other half is tied to reduce the building loads. Do I only count the half that is tied to the building or can I use all the energy produced by these panels to achieve the 2.5% or 5%?