Topic | Recent |
---|---|
Using Appendix A of ASHRAE 62.1-2007NC-2009 IEQp1: Minimum indoor air quality performanceposted by Karen Stewart on May 12, 2011, 6:38 pm
Has anyone ever used the alternative compliance option for this prerequisite by following Appendix A of ASHRAE 62.1-2007? The equipment designed for our facility is a... Last reply: Taylor Ralph, May 26, 2011, 3:36 pm |
|
Automobile Service GarageNC-2009 IEQc6.2: Controllability of systems - thermal comfortposted by Erin Adkins on May 26, 2011, 10:35 am
In an automobile service garage with 25 "stations" (there are not 25 employees, but worst case, I am assuming LEED will require each lift to be considered a "workstation"). In the way of... Last reply: Erin Adkins, May 26, 2011, 2:19 pm |
|
Parking Garage ventilationNC-2009 IEQp1: Minimum indoor air quality performanceposted by Robert English on Mar 30, 2011, 10:29 am
I am designing the truck bays at a fire station. The arrangement most closely resembles a parking garage. I am reading Ashrae 62 to require a constant run fan (assuming doors shut) with .75cfm/... Last reply: Paula Hernandez, May 26, 2011, 1:58 pm |
|
Pre K and K school questionSchools-2009 IEQp3: Minimum Acoustical Performanceposted by Sara Sweeney on Apr 27, 2011, 11:38 am
I had perviously contacted... Last reply: Sara Sweeney, May 26, 2011, 11:22 am |
|
IEQp1: Title 24-2008 in lieu of ASHRAE 62.1-2007?NC-2009 IEQp1: Minimum indoor air quality performanceposted by Leticia SooHoo on Mar 2, 2011, 5:27 pm
Fellow #LEED professionals: has anyone meet the requirements of IEQp1 using CA Title 24-2008 ventilation requirements in lieu of ASHRAE 62.1-2007? Last reply: Roger Chang, May 26, 2011, 9:33 am |
|
Storage Rooms as Critical Zone using 62MZ SpreadsheetNC-2009 IEQp1: Minimum indoor air quality performanceposted by James Keohane on May 2, 2011, 6:01 pm
I have received review comments from a LEED Review Team questioning the results of the 62MZ spreadsheet which identified a Storage Room as the "Critical Zone". The reviewer requests that I revise... Last reply: Roger Chang, May 26, 2011, 9:30 am |
|
Direct Exhaust SystemsNC-2009 IEQc3.1: Construction IAQ management plan - during constructionposted by Erik Ruoff on Jul 7, 2010, 9:21 am
Does a project where all exhaust air is exhausted directly to the outside need... Last reply: Tristan Roberts, May 26, 2011, 7:38 am |
|
green power- purchased percentageCI-2009 EAc4: Green Powerposted by Andy Plogsted on May 16, 2011, 2:59 pm
Our client owns the building and occupies 50% of the square footage of a singularly metered building. The owner (our client) signed a contract to purchase... Last reply: Tristan Roberts, May 26, 2011, 7:32 am |
|
Water Closet BaselineCI-2009 WEp1: Water Use Reductionposted by Brandon Dark on May 12, 2011, 12:48 pm
Hello, I am working on a large LEED CI project where the tenant is occupying the majority of an existing building. The restrooms in this building prior to construction had 3.5 gpf blow-out... Last reply: Tristan Roberts, May 25, 2011, 9:16 pm |
|
VOC TestingNC-2009 IEQc4.2: Low-emitting materials - paints and coatingsposted by Maya Karkour on May 6, 2011, 11:20 am
Hello, Do you guys know if the... Last reply: Nadav Malin, May 25, 2011, 7:19 pm |