Forum discussion

CI-2009 WEp1:Water Use Reduction—20% Reduction

Water Closet Baseline

Hello, I am working on a large LEED CI project where the tenant is occupying the majority of an existing building. The restrooms in this building prior to construction had 3.5 gpf blow-out flush valve water closets. As part of the scope of work for this project the excising 3.5 gpf blow-out water closets are being removed and replaced with new tank type 1.4 gpf water closets to save water. Should the baseline case be the 3.5 gpf blow-out fixtures or does the baseline need to be a 1.6 gpf tank type water closet? Thank you, Brandon

2

You rely on LEEDuser. Can we rely on you?

LEEDuser is supported by our premium members, not by advertisers.

Go premium for $15.95  »

Thu, 05/26/2011 - 01:16

Brandon, the baseline is 1.6 gpf—per the credit language. It would be great to take credit for reductions from existing conditions but LEED doesn't allow for that!

Add new comment

To post a comment, you need to register for a LEEDuser Basic membership (free) or login to your existing profile.