Topic | Recent |
---|---|
Showing energy savings in drug manufacturing facilitiesNC-2009 EAc1: Optimize Energy Performanceposted by CRB Sustainability on Jun 29, 2011, 4:39 pm
Has anyone performed an exceptional alculation to demonstrate energy savings in a drug manufacturing facility for EAc1? We are trying to demonstrate an improvement and savings by lowering the... |
|
USGBC WebinarGeneral forumsposted by Sara Cederberg on Jun 29, 2011, 3:46 pm
Hi everyone, please note that we here at USGBC are going to be discussing the revisions to the Daylight section in our upcoming webinar: |
|
Exemplary Performance for ViewsNC-2009 IEQc8.2: Daylight and views - viewsposted by Andrew Slusser on Nov 18, 2010, 12:43 pmunder review, definitely will keep you and the forum up to date on the result. If there is still clarity that needs to be resolved I may call Heschong-Mahone... Log in or register to post comments Tristan... Last reply: Bonnie Chiu, Jun 29, 2011, 3:06 pm |
|
Site Development- SSc5.1NC-2009 SSc5.1: Site development - protect or restore habitatposted by Danny Richardson on Jun 29, 2011, 10:48 am
I am doing an interior renovation of a barracks building with only minimal exterior work. I will be adding some sidewalks and a small mechanical building. The site is now approximately 65% open... Last reply: David Posada, Jun 29, 2011, 12:16 pm |
|
Automatic Parking SystemCS-2009 SSc4.3: Alternative transportation - low-emitting and fuel-efficient vehiclesposted by Anna Korinkova on Jun 29, 2011, 9:05 am
Is it possible to achieve this credit by choosing the first option (preferred parking) and using an automatic parking system. This system is designed for 24 cars therefore I need to offer 2... Last reply: David Posada, Jun 29, 2011, 11:59 am |
|
ASHRAE 90.1- Section 8 Voltage DropNC-2009 EAp2: Minimum Energy Performanceposted by Carolina Vergnano on Jun 21, 2011, 1:44 pm
In the section 8.4 Feeder conductors shall be sized for a maximum voltage drop of 2% at design loadand branch circuit condutors shall be sized for a maximum voltage drop of 3% at design load.... Last reply: Jan Wei, Jun 29, 2011, 11:18 am |
|
credit promotes transparency (not performance)Pilot-Credits PC43: Certified Productsposted by Tristan Roberts on Jun 16, 2011, 10:14 pm
My colleague at Environmental Building News, Nadav Malin, just posted a great article about this pilot credit:... Last reply: Reinhard Oppl, Jun 29, 2011, 10:02 am |
|
LEED boundary- no parking lotNC-2009 SSc8: Light Pollution Reductionposted by Danna Lopez on Jun 28, 2011, 5:57 pm
The LEED boundary for our project does not include the parking lot near the building. The form indicates that we must "upload a photometric site plan of the parking areas with a footcandle... |
|
Definition of RoofCS-2009 SSc7.2: Heat island effect - roofposted by Florian Schmidtchen on Oct 20, 2010, 10:13 pm
I am working on a project consisting of a horinzontal... Last reply: Susann Geithner, Jun 28, 2011, 5:33 pm |
|
Ink CartridgesEBOM-2009 MRc7: Solid waste management - ongoing consumablesposted by Kimberlee Dobbins on Jun 27, 2011, 2:54 pm
I am having difficulty on what to do with all my ink. I work for a city government, and can not go to recycled ink due to contracts with the printing company.I read in the LEED... Last reply: Barry Giles, Jun 28, 2011, 3:00 pm |