Log in
Forum
Topic

Light Pollution Reduction

EBOM-v4 SSc4: Light Pollution Reduction
posted by AMIR ZULKHAIRI AHMAD BANGI on Jan 10, 2023, 4:07 am

Hi All, can anyone explain the meaning of "the lamps are adequately shielded" in the Light Pollution Reduction Criteria?

Last reply: Bill Swanson, Jan 10, 2023, 4:20 pm

Using v4.1 Credit Substitution, Thresholds tab reflecting v4 requirements

NC-v4.1 EQc2: Low-emitting materials
posted by Darrah Jakab on Jan 5, 2023, 3:08 pm

My project is registered as v4 and is using the v4.1 credit substitution for Low-Emitting Materials. I clicked the blue substitution button and the v4.1 form sucessfully populated just fine, but...

Last reply: Denise Bevilaqua, Jan 10, 2023, 2:58 pm

Monthly ETO rates

NC-v4 WEp1: Outdoor water use reduction
posted by Nate Maniktala on Jun 3, 2022, 1:04 pm

Has anyone recently accesed IWMI for ETO rates? It used to be very straightforward but now the site has changed and the database doesnt seem to be accesible anymore to produce monthly ETO.

...

Last reply: Bipin Karki, Jan 10, 2023, 1:09 pm

Regarding Embodied Carbon/LCA Optimization

NC-v4.1 MRc2: Environmental Product Declarations
posted by Nagaraj Sankar on Jan 7, 2023, 8:08 am

In this credit, How can I prove that my  purchased material has compile with Embodied Carbon/LCA Action Plan or other impact reductions .

kindly clarify anyone experienced in this catagory...

Last reply: Tommy Linstroth, Jan 8, 2023, 1:02 pm

Virtual DES Energy Rates

NC-v4 EAp2: Minimum Energy Performance
posted by Todd Tewksbury on Jun 22, 2017, 1:52 pm

When modeling district cooling and heating systems using Option 1, Path 1: ASHRAE 90.1-2010 Appendix G, the LEED Reference Guide instructs the following:
"If tariffs or rates are not...

Last reply: Russell Knudson, Jan 6, 2023, 10:23 am

If all products in one category comply with the VOC emissions evaluation do we need to list the cost or surface area?

NC-v4 EQc2: Low-emitting materials
posted by Summer Gorder on Dec 22, 2022, 6:38 pm

We are having a tough time getting the costs from our subs. The subs says that the cost is bundled with other material and they can't break it up. Some are having to go there superiors to get it...

Last reply: Summer Gorder, Jan 5, 2023, 2:21 pm

Project Manager Job Opening at Sustainable Design Consulting's (SDC's) Washington, DC Office

Help Wanted: LEED-related Jobs
posted by Sandra Leibowitz on Jan 4, 2023, 9:06 pm

Sustainable Design Consulting, LLC (SDC) has immediate need for a high-performing, team-oriented Project Manager in our Washington, DC office to join our award-winning sustainability consulting...

Can Core and Shell point thresholds apply to New Construction projects with 50% unregulated energy cost in LEED v4?

NC-v4 EAc2: Optimize Energy Performance
posted by Michael on Jan 4, 2023, 2:27 am

Hi LEED experts, in LEED v4.1, NC projects with more than 50% unregulated energy cost can apply CS point thresholds to count points. I would like to ask if LEED v4 also applies the same rule....

Last reply: Marcus Sheffer, Jan 5, 2023, 9:46 am

Moving a building

Schools-NC-v4 MRc5: Construction and demolition waste management
posted by Kath Williams on Jan 4, 2023, 3:55 pm

Instead of demolition or deconstruction, this project will move an entire building across the street to another site on the campus. Can this count for materials diverted from the landfill?  What...

BECx & ASTM E2813 Standard- Fundamental vs. Enhanced building enclosure commissioning (BECx).

NC-v4.1 EAc1: Enhanced Commissioning
posted by Shahrzad Pedram on Mar 23, 2020, 8:05 pm

LEED v4.1 references...

Last reply: Aaron McEwin, Jan 4, 2023, 3:51 pm