My project is registered as v4 and is using the v4.1 credit substitution for Low-Emitting Materials. I clicked the blue substitution button and the v4.1 form sucessfully populated just fine, but the thresholds tab reflects the options for v4 (option 1: category calucation and option 2: budget calculation) and not the options for v4.1.  Has anyone run into this?