Topic | Recent |
---|---|
Need to get clear Idea about requirement of Enhanced IAQNC-v4 EQc1: Enhanced indoor air quality strategiesposted by Nagaraj Sankar on Feb 6, 2023, 1:25 am
In Office space buildings, in Enhanced Indoor Air quality strategies, Interior cross contamination prevention, LEED credit says “need to create negative pressure with respect to adjacent spaces... Last reply: Maria Porter, Feb 6, 2023, 3:10 am |
|
Base building Core vs. Tenant MeteringCS-v4 EAc3: Advanced Energy Meteringposted by Rebecca Hatchadorian on Jan 27, 2023, 10:33 am
A large office building is being certified using LEED Core & Shell. The project currently shows electrical meters on each floor that meter panels with circuits dedicated for both... Last reply: Marcus Sheffer, Feb 3, 2023, 5:22 pm |
|
Clear opening width for doorsPilot-Credits INpc125: Inclusive Designposted by Jennifer Atherton on Feb 3, 2023, 12:50 pm
Hello, Does the requirement for 0.91 meter wide interior doors refer to the minimum effective clear width through the doorway? |
|
Credits that require energy meteringEBOM-v4.1 EAp1: Energy Efficiency Best Management Practicesposted by Ricardo Filho on Feb 3, 2023, 11:36 am
Hi all hope you are having a great start of 2023! I was asked to do a very extensive research on LEED OM, it involves extracting every KPI that is related to energy metering, and... |
|
regional priority credits V4.1 New ConstructionNC-v4.1 RPc1: Regional Priorityposted by Angela Loughry on Feb 3, 2023, 12:14 pm
Hello- Per the Regional Priority Search screen our project qualifies for 2 regional priority points zip 81621 (surrounding... |
|
PHIUS CertificationPilot-Credits IPpc100: Passive Survivability and Back-up Power During Disruptionsposted by Neil Rosen on Feb 3, 2023, 11:08 am
Regarding Option 1 Path 3 - What Certification from PHIUS will satisfy this pilot credit? Design or Final? It would seem that Design would be all that should be required as Paths 1 & 2 are... |
|
Clarification re: Canada ACPCS-v4 EAc2: Optimize Energy Performanceposted by James Jin on Feb 2, 2023, 11:34 amFebruary 2, 2023- 6:16 pm Just noicing that this is submitted under a CS forum. So for CS projects you model the proposed as designed. For any systems that are not fully designed you model those the same... Last reply: James Jin, Feb 3, 2023, 9:20 am |
|
Credit Substitution Point MismatchNC-v4.1 SSc4: Rainwater managementposted by Grace Friedhoff on Feb 3, 2023, 8:59 am
We are registered as a v4 project but would like to substitute the Rainwater Management credit for version 4.1. However the credit thresholds do not update in LEEDonline when you substitute. How... |
|
Canadian ACP- NECB ASHRAE Exceptions ClarificationNC-v4 EAp2: Minimum Energy Performanceposted by Kristina K on Feb 2, 2023, 9:39 am
Hello, In the statement below from the Canadian ACP - NECB, does the Bolded sentence mean that projects do not have to adhere to those specified sections of... Last reply: Marcus Sheffer, Feb 2, 2023, 5:10 pm |
|
Medical Office Building- Exam | Soiled/Clean Workroom | Mop Sinks- What fixture should these be listed as on the form?NC-v4.1 WEc2: Indoor water use reductionposted by Catherine Blakemore on Dec 18, 2020, 12:07 pm
I am working on a LEED v4.1 BD+C Medical Office Building project and trying to complet the WEc1 form. There are no fixture options for for the following fixtures: 1) Exam Room sinks or... Last reply: emily reese moody, Feb 2, 2023, 12:13 pm |