Log in
Forum
Topic

Need to get clear Idea about requirement of Enhanced IAQ

NC-v4 EQc1: Enhanced indoor air quality strategies
posted by Nagaraj Sankar on Feb 6, 2023, 1:25 am

In Office space buildings, in Enhanced Indoor Air quality strategies, Interior cross contamination prevention, LEED credit says “need to create negative pressure with respect to adjacent spaces...

Last reply: Maria Porter, Feb 6, 2023, 3:10 am

Base building Core vs. Tenant Metering

CS-v4 EAc3: Advanced Energy Metering
posted by Rebecca Hatchadorian on Jan 27, 2023, 10:33 am

A large office building is being certified using LEED Core & Shell.

The project currently shows electrical meters on each floor that meter panels with circuits dedicated for both...

Last reply: Marcus Sheffer, Feb 3, 2023, 5:22 pm

Clear opening width for doors

Pilot-Credits INpc125: Inclusive Design
posted by Jennifer Atherton on Feb 3, 2023, 12:50 pm

Hello,

Does the requirement for 0.91 meter wide interior doors refer to the minimum effective clear width through the doorway?

Credits that require energy metering

EBOM-v4.1 EAp1: Energy Efficiency Best Management Practices
posted by Ricardo Filho on Feb 3, 2023, 11:36 am

Hi all

hope you are having a great start of 2023!

I was asked to do a very extensive research on LEED OM, it involves extracting every KPI that is related to energy metering, and...

regional priority credits V4.1 New Construction

NC-v4.1 RPc1: Regional Priority
posted by Angela Loughry on Feb 3, 2023, 12:14 pm

Hello-

Per the Regional Priority Search screen our project qualifies for 2 regional priority points zip 81621 (surrounding...

PHIUS Certification

Pilot-Credits IPpc100: Passive Survivability and Back-up Power During Disruptions
posted by Neil Rosen on Feb 3, 2023, 11:08 am

Regarding Option 1 Path 3 - What Certification from PHIUS will satisfy this pilot credit?  Design or Final?  It would seem that Design would be all that should be required as Paths 1 & 2 are...

Clarification re: Canada ACP

CS-v4 EAc2: Optimize Energy Performance
posted by James Jin on Feb 2, 2023, 11:34 am

February 2, 2023- 6:16 pm Just noicing that this is submitted under a CS forum. So for CS projects you model the proposed as designed. For any systems that are not fully designed you model those the same...

Last reply: James Jin, Feb 3, 2023, 9:20 am

Credit Substitution Point Mismatch

NC-v4.1 SSc4: Rainwater management
posted by Grace Friedhoff on Feb 3, 2023, 8:59 am

We are registered as a v4 project but would like to substitute the Rainwater Management credit for version 4.1. However the credit thresholds do not update in LEEDonline when you substitute. How...

Canadian ACP- NECB ASHRAE Exceptions Clarification

NC-v4 EAp2: Minimum Energy Performance
posted by Kristina K on Feb 2, 2023, 9:39 am

Hello,

In the statement below from the Canadian ACP - NECB, does the Bolded sentence mean that projects do not have to adhere to those specified sections of...

Last reply: Marcus Sheffer, Feb 2, 2023, 5:10 pm

Medical Office Building- Exam | Soiled/Clean Workroom | Mop Sinks- What fixture should these be listed as on the form?

NC-v4.1 WEc2: Indoor water use reduction
posted by Catherine Blakemore on Dec 18, 2020, 12:07 pm

I am working on a LEED v4.1 BD+C Medical Office Building project and trying to complet the WEc1 form.  There are no fixture options for for the following fixtures:

1)  Exam Room sinks or...

Last reply: emily reese moody, Feb 2, 2023, 12:13 pm