Topic | Recent |
---|---|
Minimum Indoor Air Quality Performance- Particulate matterNC-v4 EQp1: Minimum indoor air quality performanceposted by Nagaraj Sankar on Aug 29, 2023, 12:20 am
This is LEED reviewer question The credit form indicates that the project is located in an area where the national standard or guideline for Particulate Matter smaller... Last reply: Maria Porter, Aug 29, 2023, 3:15 am |
|
Proposed building HVAC system (ASHRAE 90.1 (2010) Table G3.1.10.b)CS-v4 EAp2: Minimum Energy Performanceposted by André Harms on Aug 10, 2023, 8:43 am18, 2023- 1:37 pm Hey Glen, I feel your pain. I was in your situation several years ago. You may have seen my post on this forum describing a similar CS situation. I learned about the signed tenant... Last reply: André Harms, Aug 29, 2023, 3:07 am |
|
Encouraging All-Gender restrooms!Pilot-Credits WEpc147: All-Gender Restroomsposted by Sara Galar on Apr 29, 2022, 8:27 am
We are happy to see how gender neutral toilets are being supported by USGBC. Maybe it could even develop as a internal policy for bigger companies. As our project is a Swedish private... Last reply: Paloma Arias, Aug 29, 2023, 3:04 am |
|
Can partial regional criteria (e.g. 85% regional) materials count towards regional multiplier?NC-v4 MRc3: Building product disclosure and optimization - sourcing of raw materialsposted by Summer Gorder on Oct 30, 2019, 4:44 pm
Hi All, Can a product meeting one of the basic credit criteria, (... Last reply: Emily Purcell, Aug 28, 2023, 1:18 pm |
|
Documentation ClarificationMid-Rise-v4 EQc7: Low-emitting productsposted by Patty Lloyd on Aug 25, 2023, 2:24 pm
So clarifying that for compliance with this credit, documentation that the product is complianct with CDPH v1.2 is enough? We don't have to provide both emissions certificate and... |
|
Open Space and Vegetated space calculationNC-v4 SSc3: Open spaceposted by Kavita Karmarkar on Jun 12, 2018, 12:12 pm
Hi all, If I have 100 acres of site area, I need 30 acres (30% of 100 acres) open space and out of that, 25% of 30 acres which is 7.5 acres must be vegetated open space. Provided that the... Last reply: Afogreen Build, Aug 25, 2023, 8:32 am |
|
Need a Template or format for preparation of ESC PlanNC-v4 SSp1: Construction Activity Pollution Preventionposted by Mujib ur Rehman on Jun 16, 2023, 7:04 am
Dear All, If i would like to take the opportunity.....If anyone could share us the format or any older project Erosion and Sedimentation Control PLan report/writeup....that will be a great... Last reply: Afogreen Build, Aug 25, 2023, 8:29 am |
|
UGR calculationNC-v4.1 EQc6: Interior lightingposted by Gustavo De las Heras Izquierdo on Aug 14, 2023, 12:34 pm
Hello, UGR can be calculated at different angles (30°, 45°, ... from nadir). At what angle should the UGR be reported for credit compliance? Thank you, Last reply: Denise Bevilaqua, Aug 25, 2023, 8:28 am |
|
Estimating energy savings from digital TAB measurementsLEED v4.1 Discussion Forumposted by April Spence on Aug 24, 2023, 4:54 pm
Hi all, I am working on a project to do digital airflow testing across our buildings. Our HVAC costs for heating and cooling are 45-50% of our operational costs in northern cal buildings... |
|
Government-mandated roadway lighting exemption- definitionNC-v4 SSc6: Light Pollution Reductionposted by Lenka Matějíčková on Aug 24, 2023, 6:51 am
Working on a car manufacturing plant, we would like to explore if roadway lighting within the area of the plant can be extempt from the assesment. By the local code, the roadway lighting... Last reply: Lenka Matějíčková, Aug 25, 2023, 7:50 am |