Log in
Forum
Topic

Hiring- LEED Project Administrator

Help Wanted: LEED-related Jobs
posted by Trisha Highnote on Jan 17, 2024, 11:12 am

Rennell Associates, LLC, is seeking a candidate to join our team as LEED® PROJECT ADMINISTRATOR. We seek a person with three or more years of experience in sustainable design and construction to...

Chlorine Flush vs. IAQ Assessment

NC-v4.1 EQc4: Indoor air quality assessment
posted by Mike Bahr on Dec 8, 2023, 9:59 am

Has anyone here done an...

Last reply: Catalyst Partners, Jan 16, 2024, 3:47 pm

Alternative measurement to material costs

NC-v4 MRc3: Building product disclosure and optimization - sourcing of raw materials
posted by Ingrid Pohl on Jan 15, 2024, 4:32 am

I'm working on a project where we cannot gather the information of the specific material costs. Is it possible to calculate the percentage based on the weight or the volume instead of by cost?...

Baseline Example

Pilot-Credits IPpc93: Prevention through design
posted by Logan McNeil on Mar 22, 2019, 5:48 pm

Our project (UCSF Block 33, SF CA) has found this credit to be worthwhile to pursue, as safety should live in every aspect of a construction project.  However, the team noted that it would have...

Last reply: Dionisio Franca, Jan 15, 2024, 3:41 am

Mastic

NC-v4.1 EQc4: Indoor air quality assessment
posted by Michelle Lockert on Jan 11, 2024, 2:04 pm

Can anyone tell me if it is okay to utilize mastic “outside” the building envelope?

Thank you.

Last reply: Gregor Braugman, Jan 13, 2024, 11:04 pm

Pilot credit Design for Indoor Air Quality and Infection Control

NC-v4 INc1: Innovation
posted by Emily Purcell on May 10, 2023, 3:56 pm

to IAQ and occupant health. Good Luck! Log in or register to post comments 0 Vote up! Hey, there's a thread for it under the CS page, too!  https://leeduser.buildinggreen.com/forum/inpc155-design...

Last reply: Dave Hubka, Jan 13, 2024, 7:59 pm

Project vs Lighting boundary

NC-v4 SSc6: Light Pollution Reduction
posted by Bill Swanson on May 17, 2017, 10:10 am

There appears to still be confusion on the differences between the Project Boundary and the Lighting Boundary.

The Project boundary is the same as shown in every other credit. All...

Last reply: Kelli Kimura, Jan 12, 2024, 4:20 pm

ny exception for the minimum 5% energy cost saving before renewable energy

NC-v4 EAp2: Minimum Energy Performance
posted by Moses Chong on Jan 11, 2024, 1:56 pm

I have a project with 2 building in LEED V4. One building is saving 14% and one building is only saving 0.05%, overall saving is 10.6%. The building with 0.05% saving actually have...

Last reply: Michael Callan, Jan 12, 2024, 1:33 pm

MRpc103- Integrative Analysis of Building Materials

Pilot-Credits MRpc103: Integrative Analysis of Building Materials
posted by Mario Kranzl on Aug 2, 2023, 7:40 am

We were at the begining quite overwhelmed with this one. It seemed like a complicated thing to do, since the analysis went really much deeper than any of the other credit required it to. But we...

Last reply: Maegan Sweeney, Jan 12, 2024, 9:38 am

Distance to entrance within a large campus

NC-v4.1 LTc6: Bicycle facilities
posted by on Nov 16, 2023, 3:35 pm

Working in predesign on a new construction building within a large site, wherein the site has only one public entrance. That entrance is an existing welcome center, and bicycles are not permitted...

Last reply: Luisa Tonelli, Jan 12, 2024, 7:35 am