How can an expansion project with zero indoor water use scope comply with WEp2 requirement to reduce potable water use > 20%?

Warehouses-NC-v4 WEp2: Indoor water use reduction
posted by Blake Jackson on Dec 1, 2023, 2:44 pm

I'm working on a 455,000gsf expansion of an existing warehouse/stroage facility. The existing facility won't be renovated, spare for the demolition of an existing exterior wall to provide...

Last reply: emily reese moody, Feb 3, 2024, 1:22 pm

Initial Water Storage

NC-v4 SSc1: Site assessment
posted by JIm Rozema on Aug 24, 2018, 11:38 am

Can you provide the definition of the Estimated TR-55 Initial Water Storage? This term is not defined in TR-55.

Last reply: Thomas Lagarde, Feb 2, 2024, 5:50 pm

Does type of signage matter?

CI-v4 EQp2: Environmental tobacco smoke control
posted by Edgar Arevalo on Feb 2, 2024, 5:13 pm

Does it matter the type of signage that's displayed at the entries of the building?  I have a contractor who placed a paper sign behind the glass door of the main entrance, which clearly states...

Diverse uses outside the project boundary/ tenant fitout area but within the same building

CI-v4 LTc2: Surrounding density and diverse uses
posted by Ranya Metwalli Shields on Jul 4, 2019, 8:53 am

Our project is a retail tenant located within a mall. I was wondering whether shops/ restaurants within the same mall where our projectis located but outside the project boundary/ tenant fitout...

Last reply: Alice Charbonneau, Feb 2, 2024, 2:02 pm

Difference between v4 and v4.1

Pilot-Credits EApc161: Electrification ACP: Energy Simulation Performance Path
posted by Camilo Velez on Feb 1, 2024, 10:12 pm

Good evening,

I have been reading about this ACP, but there are a couple of questions that I still have regarding the applicability:
 

ASHRAE 90.1 version...

Option 1 Path 2/3- Natural Ventilation and DES

CS-v4 EAp2: Minimum Energy Performance
posted by Azra on Feb 1, 2024, 5:09 am

Hello,
 
we got a kind of an unusal situation here, at least for us. 
So the project is connected to a...

Modeling indirectly conditioned spaces

NC-v4 EAp2: Minimum Energy Performance
posted by Gaston Michaud on Jan 31, 2024, 6:55 pm

Hi all, 

We are working in a CS project, and just got back the following comment from the LEED Reviewer: 

The SV-A reports indicate that most of the core spaces were modeled as...

Modeling Proposed DHW with Insulation

NC-v4 EAp2: Minimum Energy Performance
posted by Rajat Wadhwa on Jan 31, 2024, 2:07 pm

Hi I am Modeling a...

Last reply: Marcus Sheffer, Jan 31, 2024, 5:32 pm

Onsite and Offsite Both?

Pilot-Credits SSpc83: Offsite Financial Support for Habitat Protection
posted by Umesh Atre on Aug 25, 2023, 1:09 pm

Hi - Are projects that are pursuing the onsite habitat protection/restoration credit allowed to go for this Pilot in addition, or is this considered to be an alternate compliance path only?...

Last reply: Michaël Briffaz, Jan 31, 2024, 10:57 am

Can ID+C be selected for whole building?

CI-v4 MPR2: Must use reasonable LEED boundaries
posted by Leo LeQuoc on Jan 29, 2024, 11:27 pm

Our team is working on a project of a whole 2-storey (to be) newly constructed office building.

I wonder (1) whether we can apply both floors to ID+C rating system or it has to be a single...