Topic | Recent |
---|---|
Sheathing included or excluded in "wall panels"?NC-v4.1 EQc2: Low-emitting materialsposted by Iris Meeker on Jan 28, 2022, 11:48 am
In LEED v4.1 they've changed to a wall panels category which focuses mostly on finish wall treatments. Does this category include gypsum sheathing? Or does it exclude internal wall components? We... Last reply: Deb Favaretto, Oct 26, 2022, 1:15 pm |
|
MDF BaseNC-v4.1 EQc2: Low-emitting materialsposted by Allen Cornett on Aug 12, 2022, 4:13 pm
Should ... Last reply: Allen Cornett, Oct 26, 2022, 12:39 pm |
|
MRc3 Sourcing of Raw Materials- purchase of reclaimed brickNC-v4 MRc3: Building product disclosure and optimization - sourcing of raw materialsposted by chuck merritt on Oct 26, 2022, 12:27 pm
We are currently sourcing materials for the exterior space of our project and were trying to figure out if locally reclaimed belgian blocks would be applicable to the MRc3 Sourcing of Raw... |
|
Thermal Comfort- VerificationCS-2009 IEQc7: Thermal comfort - designposted by Garrett Ferguson on May 12, 2015, 6:10 pm
Could IEQc8.1 Thermal Comfort - Verification be submitted as an ID credit for CS? I don't completely understand why it is not part of the CS system. I found the ID Credit Mold Prevention... Last reply: emily reese moody, Oct 25, 2022, 9:31 pm |
|
Envelope commissioning reportNC-v4 EAc1: Enhanced Commissioningposted by Diana Giraldo on Dec 6, 2021, 3:08 pm
We have aproject that had envelope comissioning inspecton done, are there any samples of a report or any guidance for the consultant that completed the inspection? He is new to LEED and wants to... Last reply: Dave Hubka, Oct 25, 2022, 12:36 pm |
|
Effective communication with procurement teamNC-v4 MRc2: Building product disclosure and optimization - environmental product declarationsposted by Osman Faroq on Oct 24, 2022, 9:27 am
Dear All, I'm new to LEED project. I recently appointed to work for LEED project targetting LEED certification. I environmetnal engineer and good in perparing CWMP,... |
|
Campus approachNC-v4 LTc6: Bicycle facilitiesposted by Ricardo Sá on Sep 2, 2020, 12:50 pm
Dear All, we are applying the Campus Approach to certify a set of buildings within the same site (using the LEED NC BD+C v4). We are using the guidance of the... Last reply: Erin Holdenried, Oct 24, 2022, 1:42 pm |
|
Percentage of core&shell floor area in building's gross floor areaCS-v4 EAc7: Green power and carbon offsetsposted by Ricardo Sá on Aug 31, 2021, 7:54 am
Dear All, we are involved in a project of a new office building pursuing LEED Certification (Core&Shell). In what relates with EAc7 Green Power and carbon Offsets , we... Last reply: Marcus Sheffer, Oct 24, 2022, 8:50 am |
|
Calculating Total Required Green Power Quantity for Mixed Use Core and Shell (CS) projectCS-v4 EAc7: Green power and carbon offsetsposted by Josie Plaut on Aug 5, 2018, 7:23 pm
I'm supporting The HUB RiNo Station project (1000100418 - LEED v4 BD+C: CS ). We are pursuing Green Power and Carbon Offsets credit. Currently, I am using the following calculation steps to... Last reply: Linh Dang, Oct 24, 2022, 4:02 am |
|
LEED O+M v4 Pilot Credit ParticipationPilot-Credits IPpc101: Integrative processposted by Kelvin Chan on Oct 23, 2022, 11:53 pm
As per the requirements of the pilot credit, we are noting our participation in this forum. Our project is located in Hong Kong. I sugguested to sep up an IP team inclueds owner,... |