Log in
Forum
Topic

Existing MultiFamily High Rise-Exclude Occupied Commerical Space

Healthcare-v2009 MPR3: Must use a reasonable site boundary
posted by Laura Steinbrink on Aug 11, 2016, 8:29 am

We have an existing 13 Story Downtown Multifamily LEED NC v2009 registered project consisting of 210,000 sf and 200 units which will be gutted. The ground floor has approximately 5 commercial/...

Last reply: Lusjena Cakeri, Mar 7, 2023, 11:30 am

Core & Shell mandatory provisions

CS-v4 EAp2: Minimum Energy Performance
posted by Julio Fernandez Amodia on Mar 6, 2023, 1:46 pm

Hi to all,

I am currently assessing a mall LEED compliance. This is a C&S LEED project with retail units as tenant spaces where the owner has no control. I was wondering if the ASHRAE...

Last reply: Ashish Nautiyal, Mar 7, 2023, 11:27 am

Project is not required to simulate baseline in 4 orientations

NC-v4 EAp2: Minimum Energy Performance
posted by Michael on Feb 16, 2023, 2:57 am

I would like to understand the line: the project is not required to simulate 4 baseline orientations because the building orientation is dictated by the site consideration. What does "Site...

Last reply: Marcus Sheffer, Mar 7, 2023, 10:07 am

Vegetation above underground rainwater harvesting tank

Data-Centers-NC-v4.1 SSc2: Protect or Restore Habitat
posted by Y Nguyen on Mar 7, 2023, 5:48 am

Hi all, My question is regarding a landscape area calculation for Data center project. Currently design, the landscape area is including around 11% vegetation area above...

Does Option 2 apply to LEED for Retail?

Retail-NC-v4 EQc6: Interior lighting
posted by Deborah Lucking on Jul 1, 2019, 4:52 pm

Here is the Credit language "For at least 90% of the individual occupant spaces in office and administrative areas, provide individual lighting controls. In sales areas, provide controls that can...

Last reply: Martin Maribo, Mar 7, 2023, 8:00 am

Offsite Renewables contributing to the energy model

NC-v4.1 EAp2: Minimum Energy Performance
posted by Dave Hubka on May 21, 2019, 2:04 pm

Looks like we might begin to be able to claim offsite...

Last reply: Marcus Sheffer, Mar 6, 2023, 2:56 pm

Warehouse Ventilation- Filtration

Warehouses-NC-v4.1 EQc1: Enhanced indoor air quality strategies
posted by Ioanna Margariti on Mar 6, 2023, 5:43 am

Hello all,

In a project of ours, we have a warehouse with office spaces. According to the Reference Guide, the warehouse area is considered a regularly occupied space that requires fresh...

Private Company Shuttle Bus to Multiple Mode of Transit

Warehouses-NC-v4 LTc5: Access to quality transit
posted by Xye Lapuz on Aug 4, 2020, 4:54 am

A client is providing a shuttle bus service to its employees to and from the project building.  The shuttle bus connects the project building to multiple transit modes such as bus stations,...

Last reply: Ioanna Margariti, Mar 6, 2023, 5:11 am

Is Option 2 AND Option 3 possible?

NC-v4.1 MRc1: Building life-cycle impact reduction
posted by Ian McCall on Mar 6, 2023, 2:50 am

Dear LEED Experts, 

In v4.1 is possible to combine "Option 2 AND Option 3" together or is just limited to "Option 1 AND/OR Option 2     OR   ...

New Construction project with warehouse and bus parking

NC-v4 LTc8: Green vehicles
posted by Dina El-Sady on Mar 5, 2023, 6:14 am

The project is a production building with a connected warehouse and small office building , the parking located within the LEED project boundary is inclusive of bus parking used for building...