If the site is walking distance from two separate stops but service the same routes can you count both

NC-v4 LTc5: Access to quality transit
posted by David O'Connell on Jun 14, 2023, 7:22 am

The site is close to two different stops alexion and BDC but the two stops are serviced by the same routes ? can you count both stops towards the total number of buses i.e. if the 236 goes...

LPD of Building Area Method

NC-2009 EAp2: Minimum Energy Performance
posted by Jatuwat Varodompun on Aug 18, 2016, 7:58 am

1. If we decides to use 'Building area method' for energy modeling. We have to building area type including office and parking garage. Office baseline model...

Last reply: Marcus Sheffer, Jun 15, 2023, 8:35 am

Roads with 40 Km / h without bicycle paths or trails are considered as bicycle network?

NC-v4.1 LTc6: Bicycle facilities
posted by Sara BENLOUBA on Feb 19, 2021, 8:15 am

We have a project located in an area where the...

Last reply: David O'Connell, Jun 15, 2023, 8:09 am

No more than 25% of the building’s cool-wall area facing away from the equator

Pilot-Credits SSpc154: Heat Island Mitigation with Cool Walls
posted by Aleksandra Prawda on Oct 8, 2021, 7:22 am

Hi all,

I was considering this pilot credit for some projects, however, I have doubts about this part of the requirement: "To avoid disproportionate placement of cool-wall materials on the...

Last reply: Zeynep Cakir, Jun 15, 2023, 7:09 am

"No cooling tower" option removed

NC-v4.1 WEc3: Optimize Process Water Use
posted by Paula Melton on Dec 2, 2020, 9:39 am

It appears that Option 2, "No Cooling Tower," has been removed from this credit with addendum #10002465.

Last reply: Azra, Jun 14, 2023, 6:24 am

Standard EPD to use in LCA

NC-v4.1 MRc1: Building life-cycle impact reduction
posted by Jose MARTINEZ on Jun 13, 2023, 4:08 pm

Good afternoon colleagues, we have recently received comments (by LEED reviewers) about the EPDs we use for LCA in the baseline model that are not the standards to consider in the U.S. industry (...

Non-occupied Garage- Flush required?

NC-v4 EQc4: Indoor air quality assessment
posted by Leanne Conrad on Oct 26, 2017, 2:11 pm

If we have a separaetly HVAC served storage garage that is quite large and mimininally heated, does this area have to be included in the whole building flush and maintain the higher than normal...

Last reply: Dave Hubka, Jun 14, 2023, 2:57 pm

When the jurisdiction does not provide waste services...

Hospitality-EBOM-v4.1 MRp3: Waste Performance
posted by Sabrina Flagstad on Jun 2, 2023, 6:20 pm

For O+M, what to do when the project is in a jurisdiction that does not provide waste services such as compost or mixed recycling?

Last reply: Kath Williams, Jun 14, 2023, 12:57 pm

How to represent product-specific EPDs with LCA tools which don't cover them.

NC-v4.1 MRc1: Building life-cycle impact reduction
posted by on May 3, 2023, 10:56 am

While we are getting up to speed on using OneClick LCA in our practice, most of our project LCAs are still in Tally, which currently has a more fixed database of materials. For Tally models where...

Last reply: Divya Shroff, Jun 14, 2023, 12:07 pm

Product Categories

NC-v4.1 MRc4: Material Ingredients
posted by Christoph Keck on Aug 16, 2022, 8:37 am

Hi everyone,

the project I am supporting at the moment is following the alternative international compliance path where we have to meet the 100ppm REACH criteria.

In v4 they added...

Last reply: Tristan Roberts, Jun 14, 2023, 11:25 am