Definitions for a lab/office buildingNC-v4 LTc7: Reduced parking footprintposted by Maiz Rech on Sep 7, 2023, 9:56 am
Hello! I'm working on a lab/office building (3800 sq meters, 1 office floor and 2 lab floors). The building will be used only by the company that owns it, the lab and offices won't be... |
|
TABLE 1. Default Occupancy NumbersCS-v4 EQp1: Minimum indoor air quality performanceposted by Oscar Martinez on Sep 6, 2023, 12:05 am
Hi, I'm working on a warehouse project in Mexico. The rating system is v4 CS and I have a question in progress. In the storage area, we are considering the table APPENDIX 2. DEFAULT... |
|
Heat Island Mitigation with Cool WallsNC-v4 INc1: Innovationposted by Nohemi Mena on Sep 6, 2023, 12:45 pm
Hello everyone! Im working on a project pursuing the SS Pilot Credit: Heat Island Mitigation with Cool Walls, but the paint manufacturer is Sherwin Williams and does not disclose the... |
|
Advanced metering for cooling and ventilationNC-v4 EAc3: Advanced Energy Meteringposted by Dina El-Sady on Sep 6, 2023, 5:50 am
How can we separate metering for cooling an ventilation if they are both within the same unit ? Last reply: Dave Hubka, Sep 6, 2023, 9:17 am |
|
Engineered Natural Ventilation or Mechanical VentilationNC-v4.1 EQp1: Minimum indoor air quality performanceposted by Paola Moschini on Aug 24, 2023, 10:27 am
Dear all, we are working on a student residence in which every room is equipped with a façade-mounted trickle vent, allowing for the entrance of outdoor air at a rate of 40 m3/hour which is... Last reply: Julian Bork, Sep 6, 2023, 7:24 am |
|
Menstrual product dispensorsPilot-Credits WEpc147: All-Gender Restroomsposted by Emily Smith on Sep 5, 2023, 3:22 pm
The biggest hurdle we faced integrating this credit into our project was the requirement regarding providing free menstrual products. Initially, we were told that the dispensors would cost an... |
|
Rainwater ManagementNC-v4 SSc4: Rainwater managementposted by Ribert Senzoga on Sep 5, 2023, 12:52 pm
I am evaluating the Rainwater Management of a warehouse project where the water table is very high and we don't have enough depth to make a water basin. Does LEED have any suggestion to deal with... |
|
VOC content documentsNC-v4.1 EQc2: Low-emitting materialsposted by Subhashkumar A on Sep 4, 2023, 12:51 pm
To achieve the Low Emitting Material credit, we submitted thresholds for furniture, ceiling, flooring, paints & coatings, and adhesives &... Last reply: Renee Shirey, Sep 5, 2023, 8:01 am |
|
WaterSense Tool availability?CS-v4 WEp1: Outdoor water use reductionposted by Marine Petrosyan on Sep 4, 2023, 6:43 am |
|
Lighting Zone definition according to MLO for ASHRAE complianceNC-2009 SSc8: Light Pollution Reductionposted by LEED Pro Consultant on Jul 8, 2015, 12:05 pm
We are developing a high rise multi-residential project (5 buildings) in a undeveloped land, the area is between the access to a national park and multiple neighborhood (residential units). The... Last reply: Marine Petrosyan, Sep 4, 2023, 5:19 am |