Last chance to comment on LEED v5LEED v5 O&M Existing Buildings 2nd Public Commentposted by Nadav Malin on Sep 27, 2024, 9:50 am
Weigh in on the second public comment draft of LEED v5 here. You can reply to this thread or use the "Post a Question/Comment" button to start a new thread. The... |
|
Option 2. Natural land cover conditions (3 points except Healthcare, 2 points Healthcare)CS-v4.1 SSc4: Rainwater managementposted by Ammar Yahia on Aug 1, 2024, 6:24 am
As we have 203,000 sqm site area within LEED boundary, with a majority of impervious roof, non-roof driveways, walkways, and landscape areas, basements extend on 100% of site area. We want to... Last reply: Finance Team, Oct 9, 2024, 5:37 am |
|
Baseline and Proposed Constructions for a building constructed in 1970 for ID+C ProjectNC-v4 EAp2: Minimum Energy Performanceposted by Rajat Wadhwa on Oct 8, 2024, 12:03 pm
Hi, I am working on a LEED ID+C V4project , we dont have existing construction details for the building and the building was constructed in 1970, What should i assume for building... Last reply: Marcus Sheffer, Oct 8, 2024, 12:24 pm |
|
Would a fieldhouse structure be included within the LEED BoundaryNC-v4 MPR2: Must use reasonable LEED boundariesposted by on Oct 8, 2024, 10:04 am
Our project is a community centre that includes a field house... |
|
Multiple Cx Agents for the Option PathsNC-v4 EAc1: Enhanced Commissioningposted by Saagar Patel on Feb 25, 2020, 9:52 am
I do... Last reply: Joyce Kelly, Oct 8, 2024, 8:57 am |
|
TallyCAT for LEED submission?NC-v4.1 MRc1: Building life-cycle impact reductionposted by Apoorva Pradhan on Sep 5, 2024, 8:29 pm
Has anyone here used TallyCAT for a LEED submission? I’ve just started my first TallyCAT model, and it seems to only represent... Last reply: Denise Gravelle, Oct 7, 2024, 5:01 pm |
|
Proposed Building's HVAC systemCS-2009 EAp2: Minimum Energy Performanceposted by Luis Andrade on Jun 22, 2018, 9:42 am
Hi everyone, I'm modeling an office building under LEED CS v2009. The scope of C&S includes a centralized cooling and heating system (air cooled chilers and heat pumps), ventilation... Last reply: Tyler Thumma, Oct 7, 2024, 7:44 am |
|
Airport expansion and Project boundaryNC-v4.1 MPR2: Must use reasonable LEED boundariesposted by Filippo Weber on Sep 26, 2024, 7:12 am
Hello, I'm facing a though issues in establihing the corret LPB of a project and I hope you can give me some help. The project is the expansion of an existing airport and it includes:... Last reply: Andrey Kuznetsov, Oct 5, 2024, 11:26 pm |
|
Diverse UsesCI-v4.1 LTc2: Surrounding density and diverse usesposted by Andrea Tayah Esperão Malta de Campos on Sep 28, 2024, 7:26 pm
I am part of a project in São Paulo, Brazil, that is located less than 800m walking distance from two shopping centers entrancies. Can I count all the uses within the shopping centers using the... Last reply: Andrey Kuznetsov, Oct 5, 2024, 9:22 am |
|
Can decorative lighting be excluded from interior lighting requirements?NC-v4.1 EQc6: Interior lightingposted by Sara BENLOUBA on Nov 23, 2023, 8:36 am
Dear experts, Regarding the... Last reply: Andrey Kuznetsov, Oct 4, 2024, 11:30 pm |