Log in
Forum
Topic

Last chance to comment on LEED v5

LEED v5 O&M Existing Buildings 2nd Public Comment
posted by Nadav Malin on Sep 27, 2024, 9:50 am

Weigh in on the second public comment draft of LEED v5 here. You can reply to this thread or use the "Post a Question/Comment" button to start a new thread. The...

Option 2. Natural land cover conditions (3 points except Healthcare, 2 points Healthcare)

CS-v4.1 SSc4: Rainwater management
posted by Ammar Yahia on Aug 1, 2024, 6:24 am

As we have 203,000 sqm site area within LEED boundary, with a majority of impervious roof, non-roof driveways, walkways, and landscape areas, basements extend on 100% of site area. We want to...

Last reply: Finance Team, Oct 9, 2024, 5:37 am

Baseline and Proposed Constructions for a building constructed in 1970 for ID+C Project

NC-v4 EAp2: Minimum Energy Performance
posted by Rajat Wadhwa on Oct 8, 2024, 12:03 pm

Hi, 
 

I am working on a LEED ID+C V4project , we dont have existing construction details for the building and the building was constructed in 1970, What should i assume for building...

Last reply: Marcus Sheffer, Oct 8, 2024, 12:24 pm

Would a fieldhouse structure be included within the LEED Boundary

NC-v4 MPR2: Must use reasonable LEED boundaries
posted by on Oct 8, 2024, 10:04 am

Our project is a community centre that includes a field house...

Multiple Cx Agents for the Option Paths

NC-v4 EAc1: Enhanced Commissioning
posted by Saagar Patel on Feb 25, 2020, 9:52 am

I do...

Last reply: Joyce Kelly, Oct 8, 2024, 8:57 am

TallyCAT for LEED submission?

NC-v4.1 MRc1: Building life-cycle impact reduction
posted by Apoorva Pradhan on Sep 5, 2024, 8:29 pm

Has anyone here used TallyCAT for a LEED submission? I’ve just started my first TallyCAT model, and it seems to only represent...

Last reply: Denise Gravelle, Oct 7, 2024, 5:01 pm

Proposed Building's HVAC system

CS-2009 EAp2: Minimum Energy Performance
posted by Luis Andrade on Jun 22, 2018, 9:42 am

Hi everyone,

I'm modeling an office building under LEED CS v2009. The scope of C&S includes a centralized cooling and heating system (air cooled chilers and heat pumps), ventilation...

Last reply: Tyler Thumma, Oct 7, 2024, 7:44 am

Airport expansion and Project boundary

NC-v4.1 MPR2: Must use reasonable LEED boundaries
posted by Filippo Weber on Sep 26, 2024, 7:12 am

Hello,

I'm facing a though issues in establihing the corret LPB of a project and I hope you can give me some help. The project is the expansion of an existing airport and it includes:...

Last reply: Andrey Kuznetsov, Oct 5, 2024, 11:26 pm

Diverse Uses

CI-v4.1 LTc2: Surrounding density and diverse uses
posted by Andrea Tayah Esperão Malta de Campos on Sep 28, 2024, 7:26 pm

I am part of a project in São Paulo, Brazil, that is located less than 800m walking distance from two shopping centers entrancies. Can I count all the uses within the shopping centers using the...

Last reply: Andrey Kuznetsov, Oct 5, 2024, 9:22 am

Can decorative lighting be excluded from interior lighting requirements?

NC-v4.1 EQc6: Interior lighting
posted by Sara BENLOUBA on Nov 23, 2023, 8:36 am

Dear experts,

Regarding the...

Last reply: Andrey Kuznetsov, Oct 4, 2024, 11:30 pm