SCAQMD Rule 1168 (Amended October 6, 2017)

NC-2009 IEQc4.1: Low-emitting materials - adhesives and sealants
posted by Wai Hoong Yap on Sep 23, 2021, 9:16 pm

I have a silicone sealant which is classify as "All Other Architectural Sealants", which...

Last reply: Cecile de Villemeur, May 27, 2022, 12:07 pm

Commissioning on C&S building not complete because of push back

CS-2009 EAp1: Fundamental Commissioning of Building Energy Systems
posted by Edgar Arevalo on May 26, 2022, 6:02 pm

My team is having an issue with the mechanical contractor who installed lab exhaust fans in the buildings.  The...

Last reply: Brian Salazar, May 27, 2022, 10:26 am

Open fireplaces

NC-v4 EQp1: Minimum indoor air quality performance
posted by Cristina Florit on Jan 24, 2020, 8:43 am

I am working in a hotel project where open fireplaces are being considered.

As all fireplaces in residential projects must have solid glass enclosures, I am wondering if this requirement...

Last reply: Panagiotis Paliouras, May 26, 2022, 10:42 am

GreenGuard certification

CS-v4.1 EQc2: Low-emitting materials
posted by Allen Cornett on May 25, 2022, 3:51 pm

I have never used a GreenGuard certificate before.  The Maximum Allowable Predicted Concentrations are higher than those in the GreenGuard Gold certification.  Is the GreenGuard certification...

Last reply: Emily Purcell, May 26, 2022, 10:15 am

Using Autocase to document SSpc113

Pilot-Credits SSpc113: Informing Design Using Triple Bottom Line Analysis
posted by Jennifer Wehling on Apr 27, 2021, 7:05 pm

We used Autocase to document this pilot credit. It was a good process, though we needed lots of help from our account rep, who was thankfully willing to walk us through the process.  We found...

Last reply: Jill Kurtz, May 25, 2022, 2:56 pm

Is it applicable for a historic wall project to obtain LEED New Construction BD+C Certification?

NC-v4 MPR2: Must use reasonable LEED boundaries
posted by Amgad Khattab on May 25, 2022, 11:50 am

Is it applicable for a historic wall project to obtain LEED New Construction BD+C Certification?

The project consist of constructing a new wall with multiple entry gates. Every gate has...

Road surface sealcoating

EBOM-v4.1 MRp2: Facility maintenance and renovations policy
posted by michael owen on May 25, 2022, 8:32 am

What restrictions and or credits are available for asphalt sealcoating parking lots and roadway on a  LEED...

Rating system and group approach

LEED Rating System Selection
posted by Shiva Honarvar on May 24, 2022, 1:10 pm

Hello everyone,

We have a project that has two office towers and one residential tower on a single site, with the same owner. One of the office towers and the residential tower are...

Restore habitat overlap with rainwater infiltration

NC-v4 SSc2: Site development - protect or restore habitat
posted by Andrea Vickers on Jun 15, 2021, 1:30 pm

I'd like your opinions on a phrase in Protect or Restore Habitat: "Project teams may exclude vegetated landscape areas that are constructed to accommodate rainwater...

Last reply: Andrea Vickers, May 24, 2022, 11:45 am

Anticipated Project Type

LEED Rating System Selection
posted by Barbara Beckmann on May 24, 2022, 10:40 am

On the process of registration, in step 4 - Project Information on Anticipated Project Type there isn't a category that clearly represents the building we are working. This is a building with an...