Topic | Recent |
---|---|
Ascent Macerating ToiletCI-v4 WEp1: Indoor water use reductionposted by Niccolo Benghi on Jun 26, 2020, 2:32 pm
We are planning on using an ascent macerating toilet. I was wondering how to properly specify it in the Water Use calculator. Would this fixture be allowable? Last reply: emily reese moody, Jun 13, 2022, 2:50 pm |
|
Minimum Energy Performance CalculatorNC-v4 EAc2: Optimize Energy Performanceposted by Sarah Leenknegt on Jun 13, 2022, 6:28 am
Hi I am wondering if I am alone in this.. On each LEED Project, I waste a lot of time to enter data in the Excel Performance Calculator. In a lot of cells, after entering the data, I am... Last reply: , Jun 13, 2022, 9:08 am |
|
CLT BuildingsCS-v4.1 MRc3: Sourcing of Raw Materialsposted by Marelle Davey on Jun 10, 2022, 6:20 pm
Hi - has anyone targeted this credit for a CLT building? Given that the timber used is... |
|
Separation of Service Sinks and Indoor FixturesNC-v4 WEc4: Water meteringposted by Timothy Ian Middleton on May 6, 2022, 12:15 am
We have a project where we have irrigation, restaurant tenants, indoor fixtures and service sinks. The 1st 2 are easily metered, but it is not easy to separate the indoor fixtures and service... Last reply: Summer Minchew, Jun 10, 2022, 3:42 pm |
|
Tankless Electrical Water HeatersCS-2009 EAp2: Minimum Energy Performanceposted by Pedro Urazan on May 11, 2016, 10:51 am
Hi, Do tankless Electrical water heaters have to comply with any efficiency requirements, in order to comply with the 7.4 mandatory provisions? On table 7.8 the performance requirements... Last reply: , Jun 10, 2022, 10:53 am |
|
Certification for paint productsNC-v4.1 EQc2: Low-emitting materialsposted by Francesco Lupoi on Jun 8, 2022, 5:08 am
Hi all, Emission-minimiert-loesemitterfrei for a paint product is valid for the credit EQc2 - Low Emitting Materials? Thanks in advice Last reply: Francesco Lupoi, Jun 10, 2022, 3:58 am |
|
Baseline system typeNC-v4 EAp2: Minimum Energy Performanceposted by Nikos Tsitsikas on Jun 7, 2022, 1:19 pm
Hi all, We are currently working on a project which is a building with two levels - Ground floor level and Level 01. Level 01 is 1,000 m2 and consists of hotel rooms, whereas Ground floor... Last reply: Nikos Tsitsikas, Jun 9, 2022, 12:08 pm |
|
Automated Warehouse- Fresh Air RequirementsNC-v4 EQp1: Minimum indoor air quality performanceposted by Hashir Usman on Jun 9, 2022, 10:31 am
Hello everyone! I would like to ask if anyone has some experience or can advise me regarding the fresh air requirements in case of an Automated Warehouse with no occupancy. My project is... |
|
Building-height-to-street-centerline ratio for garden blocks contains no building.ND-Plan-v4 NPDc1: Walkable Streetsposted by Pongpitch J. on Jun 8, 2022, 10:38 pm
Hi, Our team has a question about LEED-ND: Walkable requirement in section M (Building height to street ratio), the requirement is to comply with the 40% of the block... |
|
Credit requirement wording: with the intention of multiyear renewalNC-v4 EAc4: Demand responseposted by John Covello on Jun 7, 2022, 3:40 pm
Hello, Does the contract have to state that it is eligible for renewal beyond the one year requirement? Is that what is meant by "with the intention of multiyear renewal"? Or does this... Last reply: John Covello, Jun 8, 2022, 11:48 am |