Custom Built Salvaged Wood FurnitureCI-2009 MRc3.2: Materials reuse - furniture and furnishingsposted by Max Calabro on Mar 3, 2011, 1:58 pm
I'm working on a restaurant, and we're having our dining tables custom built from salvaged... Last reply: Susie Spivey-Tilson, Mar 9, 2011, 6:39 pm |
|
Uploading DocumentationNC-2009 IEQc6.2: Controllability of systems - thermal comfortposted by Maya Karkour on Mar 7, 2011, 10:44 am
Hi all, When submitting documentation for this credit, through LEED Online, are we supposed to upload all the plans showing the thermal controls or can we just upload some of them (i.e.... Last reply: David Hubka, Mar 9, 2011, 3:33 pm |
|
Light trespass at Property LineEBOM-2009 SSc8: Light Pollution Reductionposted by Mark Stromberg on Mar 9, 2011, 3:02 pm
Does LEED-2009 EBOM... |
|
Baseline Building Envelope requirementsNC-2009 EAc1: Optimize Energy Performanceposted by alberto carlesi on Mar 9, 2011, 11:49 am
Hi, I'm modeling a building (not residential),for EAc1, located in climate zone 6 (winter design temperature 5°F). Proposed building envelope is high insulated, thus heating system capacity for... Last reply: Marcus Sheffer, Mar 9, 2011, 2:32 pm |
|
rating system selection forumGeneral forumsposted by Tristan Roberts on Mar 4, 2011, 11:14 am
Michelle, only LEED for Existing Buildings requires recertification, and that's required within 5 years, not 1. Last reply: Tristan Roberts, Mar 9, 2011, 11:14 am |
|
Private BalconiesNC-2009 SSc5.2: Site development - maximize open spaceposted by Maya Karkour on May 4, 2010, 9:50 am
Hi all, We are performing a LEED 2009 NC assessment for a 42-story high rise residential building. Each apartment has several balconies. Can we consider all these private balconies to be "... Last reply: Susann Geithner, Mar 9, 2011, 11:08 am |
|
LEED Certifications for Multiple BuildingsLEED Guidance for Campuses and Multiple Buildingsposted by Keerthi Ratnayake on Mar 8, 2011, 11:27 pm
We have two buildings to be certified; one new and one existing. What are the requirements for these to be evaluated as one building for the LEED certifications? HVAC chillers etc. will be... Last reply: Clint Newton, Mar 9, 2011, 9:15 am |
|
Louver VentsNC-2009 IEQc8.1: Daylight and views - daylightposted by Biagio Arevalo on Mar 3, 2011, 4:00 pm
Does anyone know if for the prescriptive path the light that passes through lovers count? My project windows go from floor to ceiling and the first 3´ is a louver, the next 5´ is a window and the... Last reply: Eddy Santosa, Mar 8, 2011, 7:21 pm |
|
LT, VLT & TvisNC-2009 IEQc8.1: Daylight and views - daylightposted by Biagio Arevalo on Mar 3, 2011, 11:59 am
I´m planning to approach this credit through the prescriptive path but I´ve been having some difficulties finding the... Last reply: Eddy Santosa, Mar 8, 2011, 7:19 pm |
|
I'm tired of Henry GiffordGeneral forumsposted by Eric Johnson on Sep 14, 2010, 12:03 pm
Henry (& others) should have read the Development of a California Commercial Building Energy Benchmarking Database & Energy Benchmarking In Commercial Office Buildings DOE papers. They... Last reply: Eric Johnson, Mar 8, 2011, 6:49 pm |