Radiant Temperature MeasurementEBOM-2009 IEQc2.3: Occupant comfort - thermal comfort monitoringposted by Sonrisa Lucero on Oct 10, 2011, 5:04 pm
In the picture on the "Bird's Eye View" page, there is a picture of an infrared thermometer. This would take the temperature of an object. However, in order to comply with this credit, it is my... Last reply: Jeremy Poling, Nov 28, 2011, 1:44 pm |
|
Process for corrective actionCS-2009 EAc5.2: Measurement and verification - tenant submeteringposted by Maya Karkour on Apr 27, 2011, 3:50 am
Hello, One of the requirements of EA Credit 5.2 is to "provide a process for corrective action if the results of the M&V plan indicate that energy savings are not being achieved".... Last reply: Gordon Shymko, Nov 28, 2011, 1:24 pm |
|
Gross ARI rated cooling capacityNC-2009 EAc4: Enhanced Refrigerant Managementposted by Devani PERERA on Apr 27, 2011, 7:12 am
Hi, Last reply: Christopher Schaffner, Nov 28, 2011, 1:09 pm |
|
EAp2- Compliance to ASHRAE standardsCI-2009 EAp2: Minimum Energy Performanceposted by Paolo Losi on Nov 25, 2011, 6:39 am
Hi all, Last reply: Christopher Schaffner, Nov 28, 2011, 12:42 pm |
|
Including Mezzanines in the Energy ModelNC-2009 EAp2: Minimum Energy Performanceposted by Kellie Hollenbeck on Oct 13, 2011, 11:50 am
We are clear that for the total Gross Floor Area we have to include mezzanines. The project mezzanines are open to the floor below and are not used as... Last reply: Christopher Schaffner, Nov 28, 2011, 11:54 am |
|
Target FinderNC-2009 EAp2: Minimum Energy Performanceposted by TEY SIUNG on Nov 25, 2011, 3:03 am
We are building a Hotel in Doha, Qatar. We are try to apply for LEED certified. While I start , I meet a Target Finder problem. This Target Finder only design for US climate. No international... Last reply: Christopher Schaffner, Nov 28, 2011, 11:48 am |
|
Hotel with a few buildingsLEED Guidance for Campuses and Multiple Buildingsposted by Barbra Trae on Nov 25, 2011, 3:34 am
I am working on a hotel project which comprises a few buildings (main building + some small buildings, all contain guest rooms). The project is under 1 phase and will be run by 1 operator. Can... Last reply: Barbra Trae, Nov 25, 2011, 4:08 am |
|
Advice on acceptable approach to credit achievement for IEQc5NC-2009 IEQc5: Indoor Chemical and Pollutant Source Controlposted by Shelley Duan on Nov 24, 2011, 1:18 pm
Is a covered exterior grate system (e.g, outside a vestibule) at all high volume entryways an acceptable approach to credit achievement for IEQc5? Any advice or guidance would be most appreciated... Last reply: BH ., Nov 25, 2011, 3:18 am |
|
RequirementsCS-2009 IEQc4.4: Low-emitting materials - composite wood and agrifiber productsposted by Guillermo Hernandez Espinoza on Nov 24, 2011, 9:38 pm
This may seem to be a silly question, but is causing me lots of issues, is there any kind of requirement to achieve this credit other than just an all or nothing? I mean, like some relation... Last reply: Tristan Roberts, Nov 25, 2011, 12:02 am |
|
Elevated Floors. Do they need Floorscore?NC-2009 IEQc4.3: Low-emitting materials - flooring systemsposted by Adriana Hansen on May 30, 2011, 10:14 am
Hi, Last reply: Petra Hajná, Nov 24, 2011, 9:34 am |