Need to get clear Idea about requirement of Enhanced IAQ

NC-v4 EQc1: Enhanced indoor air quality strategies
posted by Nagaraj Sankar on Feb 6, 2023, 1:25 am

In Office space buildings, in Enhanced Indoor Air quality strategies, Interior cross contamination prevention, LEED credit says “need to create negative pressure with respect to adjacent spaces...

Last reply: Maria Porter, Feb 6, 2023, 3:10 am

Base building Core vs. Tenant Metering

CS-v4 EAc3: Advanced Energy Metering
posted by Rebecca Hatchadorian on Jan 27, 2023, 10:33 am

A large office building is being certified using LEED Core & Shell.

The project currently shows electrical meters on each floor that meter panels with circuits dedicated for both...

Last reply: Marcus Sheffer, Feb 3, 2023, 5:22 pm

Clear opening width for doors

Pilot-Credits INpc125: Inclusive Design
posted by Jennifer Atherton on Feb 3, 2023, 12:50 pm

Hello,

Does the requirement for 0.91 meter wide interior doors refer to the minimum effective clear width through the doorway?

Credits that require energy metering

EBOM-v4.1 EAp1: Energy Efficiency Best Management Practices
posted by Ricardo Filho on Feb 3, 2023, 11:36 am

Hi all

hope you are having a great start of 2023!

I was asked to do a very extensive research on LEED OM, it involves extracting every KPI that is related to energy metering, and...

regional priority credits V4.1 New Construction

NC-v4.1 RPc1: Regional Priority
posted by Angela Loughry on Feb 3, 2023, 12:14 pm

Hello-

Per the Regional Priority Search screen our project qualifies for 2 regional priority points zip 81621 (surrounding...

PHIUS Certification

Pilot-Credits IPpc100: Passive Survivability and Back-up Power During Disruptions
posted by Neil Rosen on Feb 3, 2023, 11:08 am

Regarding Option 1 Path 3 - What Certification from PHIUS will satisfy this pilot credit?  Design or Final?  It would seem that Design would be all that should be required as Paths 1 & 2 are...

Clarification re: Canada ACP

CS-v4 EAc2: Optimize Energy Performance
posted by James Jin on Feb 2, 2023, 11:34 am

forum. So for CS projects you model the proposed as designed. For any systems that are not fully designed you model those the same as the baseline building. Log in or register to post comments 1 Vote up!...

Last reply: James Jin, Feb 3, 2023, 9:20 am

Credit Substitution Point Mismatch

NC-v4.1 SSc4: Rainwater management
posted by Grace Friedhoff on Feb 3, 2023, 8:59 am

We are registered as a v4 project but would like to substitute the Rainwater Management credit for version 4.1. However the credit thresholds do not update in LEEDonline when you substitute. How...

Canadian ACP- NECB ASHRAE Exceptions Clarification

NC-v4 EAp2: Minimum Energy Performance
posted by Kristina K on Feb 2, 2023, 9:39 am

Hello,

In the statement below from the Canadian ACP - NECB, does the Bolded sentence mean that projects do not have to adhere to those specified sections of...

Last reply: Marcus Sheffer, Feb 2, 2023, 5:10 pm

Medical Office Building- Exam | Soiled/Clean Workroom | Mop Sinks- What fixture should these be listed as on the form?

NC-v4.1 WEc2: Indoor water use reduction
posted by Catherine Blakemore on Dec 18, 2020, 12:07 pm

I am working on a LEED v4.1 BD+C Medical Office Building project and trying to complet the WEc1 form.  There are no fixture options for for the following fixtures:

1)  Exam Room sinks or...

Last reply: emily reese moody, Feb 2, 2023, 12:13 pm