Need to get clear Idea about requirement of Enhanced IAQNC-v4 EQc1: Enhanced indoor air quality strategiesposted by Nagaraj Sankar on Feb 6, 2023, 1:25 am
In Office space buildings, in Enhanced Indoor Air quality strategies, Interior cross contamination prevention, LEED credit says “need to create negative pressure with respect to adjacent spaces... Last reply: Maria Porter, Feb 6, 2023, 3:10 am |
|
Base building Core vs. Tenant MeteringCS-v4 EAc3: Advanced Energy Meteringposted by Rebecca Hatchadorian on Jan 27, 2023, 10:33 am
A large office building is being certified using LEED Core & Shell. The project currently shows electrical meters on each floor that meter panels with circuits dedicated for both... Last reply: Marcus Sheffer, Feb 3, 2023, 5:22 pm |
|
Clear opening width for doorsPilot-Credits INpc125: Inclusive Designposted by Jennifer Atherton on Feb 3, 2023, 12:50 pm
Hello, Does the requirement for 0.91 meter wide interior doors refer to the minimum effective clear width through the doorway? |
|
Credits that require energy meteringEBOM-v4.1 EAp1: Energy Efficiency Best Management Practicesposted by Ricardo Filho on Feb 3, 2023, 11:36 am
Hi all hope you are having a great start of 2023! I was asked to do a very extensive research on LEED OM, it involves extracting every KPI that is related to energy metering, and... |
|
regional priority credits V4.1 New ConstructionNC-v4.1 RPc1: Regional Priorityposted by Angela Loughry on Feb 3, 2023, 12:14 pm
Hello- Per the Regional Priority Search screen our project qualifies for 2 regional priority points zip 81621 (surrounding... |
|
PHIUS CertificationPilot-Credits IPpc100: Passive Survivability and Back-up Power During Disruptionsposted by Neil Rosen on Feb 3, 2023, 11:08 am
Regarding Option 1 Path 3 - What Certification from PHIUS will satisfy this pilot credit? Design or Final? It would seem that Design would be all that should be required as Paths 1 & 2 are... |
|
Clarification re: Canada ACPCS-v4 EAc2: Optimize Energy Performanceposted by James Jin on Feb 2, 2023, 11:34 amforum. So for CS projects you model the proposed as designed. For any systems that are not fully designed you model those the same as the baseline building. Log in or register to post comments 1 Vote up!... Last reply: James Jin, Feb 3, 2023, 9:20 am |
|
Credit Substitution Point MismatchNC-v4.1 SSc4: Rainwater managementposted by Grace Friedhoff on Feb 3, 2023, 8:59 am
We are registered as a v4 project but would like to substitute the Rainwater Management credit for version 4.1. However the credit thresholds do not update in LEEDonline when you substitute. How... |
|
Canadian ACP- NECB ASHRAE Exceptions ClarificationNC-v4 EAp2: Minimum Energy Performanceposted by Kristina K on Feb 2, 2023, 9:39 am
Hello, In the statement below from the Canadian ACP - NECB, does the Bolded sentence mean that projects do not have to adhere to those specified sections of... Last reply: Marcus Sheffer, Feb 2, 2023, 5:10 pm |
|
Medical Office Building- Exam | Soiled/Clean Workroom | Mop Sinks- What fixture should these be listed as on the form?NC-v4.1 WEc2: Indoor water use reductionposted by Catherine Blakemore on Dec 18, 2020, 12:07 pm
I am working on a LEED v4.1 BD+C Medical Office Building project and trying to complet the WEc1 form. There are no fixture options for for the following fixtures: 1) Exam Room sinks or... Last reply: emily reese moody, Feb 2, 2023, 12:13 pm |