Topic | Recent |
---|---|
Multiple Drainage PatternsNC-2009 SSc6.1: Stormwater design - quantity controlposted by Joseph Blanco on Feb 7, 2011, 3:14 pm
Can you tell me how to calculate for multiple draingage sites, i have Three on this particular project. The TC is based on the length and travel and the slope towards the discharge point . Do i... Last reply: Gregory Hurst, Feb 8, 2011, 2:37 pm |
|
Equipment PurchasesEBOM-2009 IEQp3: Green Cleaning Policyposted by Curt Pascoe on Feb 8, 2011, 11:03 am
We are implementing a Green Cleaning Policy for an ID credit in NCv2009, which simply requires that you meet this prerequisite (not Credits 3.3 & 3.4). However, despite being NC, this... Last reply: Curt Pascoe, Feb 8, 2011, 2:08 pm |
|
Elevator cabsSchools-2009 IEQc4.6: Low-Emitting Materials—Ceiling and Wall Systemsposted by Linda Davisson on Feb 8, 2011, 12:10 pm
Often the finishes in an elevator cab are inert materials/non-emitting such as metal panels for walls and plastic unit lighting for ceilings. In the case of plastic laminate panels, the materials... Last reply: Josh Jacobs, Feb 8, 2011, 1:51 pm |
|
Indoor/Outdoor Carpeting in Large Open-Air Tropical LobbyEBOM-2009 IEQc3.5: Green cleaning - indoor chemical and pollutant source controlposted by Terry Gorski on Feb 4, 2011, 12:48 pm
For a building located in a tropical climate with an open- air lobby around the elevator banks, would indoor/outdoor carpeting completely under the cover of the building meet the requirements?... Last reply: Tristan Roberts, Feb 8, 2011, 12:13 pm |
|
waste cycle and deskside recyclingEBOM-2009 MRc6: Solid waste management - waste stream auditposted by Wendy Gibson on Jan 25, 2011, 5:33 pm
We are currently trying to determine an adequate and manageable approach to this credit. Here is our scenario Last reply: Wendy Gibson, Feb 8, 2011, 12:11 pm |
|
Exemplary PerformanceNC-2009 IEQc8.2: Daylight and views - viewsposted by Lee Dingemans on Feb 7, 2011, 2:47 pm
Question Last reply: Carlie Bullock-Jones, Feb 8, 2011, 11:06 am |
|
Building typesNC-2009 EAc1: Optimize Energy Performanceposted by Jeff Riggs on Jan 21, 2011, 4:14 pm
We are working on a materials recycling facility that will be comprised of a two story office building (administration) and a large materials handling space (100,000 sf+) that is attached. The... Last reply: Marcus Sheffer, Feb 8, 2011, 9:25 am |
|
How long does the monthly monitoring last for?Pilot-Credits WEpc17: Cooling tower water useposted by William Wong on Jan 26, 2011, 10:58 pm
One of the mentioned requirements is to report results of the amount of potable water used, microbiological levels, blowdown and corrosion on monthly basis, but for how long after occupancy? Last reply: Christina Macken, Feb 8, 2011, 9:24 am |
|
LEED-CS for apartmentCS-2009 EAc1: Optimize Energy Performanceposted by Chaan Ah Bahk on Feb 7, 2011, 4:54 am
We are looking forward to pursue LEED for an apartment building(only residential, of which each residential units will be sold to different tenants. Last reply: Marcus Sheffer, Feb 8, 2011, 8:42 am |
|
10% exemption?EBOM-2009 IEQp1: Minimum indoor air quality performanceposted by Alice Cook on Jan 26, 2011, 5:43 pm
I'm unclear if 10% of space can be exempted for this prerequisite. Could someone clarify this? We have a project where we have several retail spaces on the ground floor of an office high rise... Last reply: Tristan Roberts, Feb 8, 2011, 8:37 am |