Topic | Recent |
---|---|
Light trespass at Property LineEBOM-2009 SSc8: Light Pollution Reductionposted by Mark Stromberg on Mar 9, 2011, 3:02 pm
Does LEED-2009 EBOM... |
|
Baseline Building Envelope requirementsNC-2009 EAc1: Optimize Energy Performanceposted by alberto carlesi on Mar 9, 2011, 11:49 am
Hi, I'm modeling a building (not residential),for EAc1, located in climate zone 6 (winter design temperature 5°F). Proposed building envelope is high insulated, thus heating system capacity for... Last reply: Marcus Sheffer, Mar 9, 2011, 2:32 pm |
|
rating system selection forumGeneral forumsposted by Tristan Roberts on Mar 4, 2011, 11:14 am
Michelle, only LEED for Existing Buildings requires recertification, and that's required within 5 years, not 1. Last reply: Tristan Roberts, Mar 9, 2011, 11:14 am |
|
Private BalconiesNC-2009 SSc5.2: Site development - maximize open spaceposted by Maya Karkour on May 4, 2010, 9:50 am
Hi all, We are performing a LEED 2009 NC assessment for a 42-story high rise residential building. Each apartment has several balconies. Can we consider all these private balconies to be "... Last reply: Susann Geithner, Mar 9, 2011, 11:08 am |
|
LEED Certifications for Multiple BuildingsLEED Guidance for Campuses and Multiple Buildingsposted by Keerthi Ratnayake on Mar 8, 2011, 11:27 pm
We have two buildings to be certified; one new and one existing. What are the requirements for these to be evaluated as one building for the LEED certifications? HVAC chillers etc. will be... Last reply: Clint Newton, Mar 9, 2011, 9:15 am |
|
Louver VentsNC-2009 IEQc8.1: Daylight and views - daylightposted by Biagio Arevalo on Mar 3, 2011, 4:00 pm
Does anyone know if for the prescriptive path the light that passes through lovers count? My project windows go from floor to ceiling and the first 3´ is a louver, the next 5´ is a window and the... Last reply: Eddy Santosa, Mar 8, 2011, 7:21 pm |
|
LT, VLT & TvisNC-2009 IEQc8.1: Daylight and views - daylightposted by Biagio Arevalo on Mar 3, 2011, 11:59 am
I´m planning to approach this credit through the prescriptive path but I´ve been having some difficulties finding the... Last reply: Eddy Santosa, Mar 8, 2011, 7:19 pm |
|
I'm tired of Henry GiffordGeneral forumsposted by Eric Johnson on Sep 14, 2010, 12:03 pm
Henry (& others) should have read the Development of a California Commercial Building Energy Benchmarking Database & Energy Benchmarking In Commercial Office Buildings DOE papers. They... Last reply: Eric Johnson, Mar 8, 2011, 6:49 pm |
|
Office building, Jeddah, Saudi AEBOM-2009 EAc1: Optimize Energy Efficiency Performanceposted by Lise Dannesboe on Feb 21, 2011, 8:31 am
We have established a rating for the building based on Case 2 Option 1 - beacause the building is not eligible for an Energy Star rating. Based on last years energy data the EA Credit 1 Case 2... Last reply: Marc Mondor, Mar 8, 2011, 5:56 pm |
|
maintaining LEED certificationGeneral forumsposted by Tristan Roberts on Mar 8, 2011, 12:33 pm
Pinky, if you're talking about LEED-NC v2.2, this is not a question of maintaining your certification. Once awarded, only the LEED-... Last reply: Pinky Khatri, Mar 8, 2011, 12:53 pm |