Topic | Recent |
---|---|
LEED v5 BD+C/ID+C Materials and Resources public commentsLEED v5 BD+C/ID+C: Materials and Resources Public Commentsposted by Nadav Malin on Apr 3, 2024, 6:25 am
Share your comments on the first public comment draft of the LEED v5 BD+C/ID+C Materials and Resources category on this forum. You can reply to this thread or use the "Post a Question or Comment... Last reply: Jodie Thill, May 24, 2024, 1:31 pm |
|
IDC Assess and Reduce Embodied CarbonLEED v5 BD+C/ID+C: Materials and Resources Public Commentsposted by Nadav Malin on May 24, 2024, 1:04 pm
The ID+C credit Assess and Reduce Embodied Carbon, Option 2: It's unclear what are the referenced Paths 1, 2 and 3 for this credit. I also don't understand how Options 1 and 2 interact,... |
|
LEED v5 BD+C/ID+C Sustainable Sites public commentsLEED v5 BD+C/ID+C: Sustainable Sites Public Commentsposted by Nadav Malin on Apr 3, 2024, 6:22 am
Share your comments on the first public comment draft of the LEED v5 BD+C/ID+C Sustainable Sites category on this forum. You can reply to this thread or use the "Post a Question or Comment"... Last reply: Jodie Thill, May 24, 2024, 12:59 pm |
|
LEED O&M Starter Kit and Pilot Credit Safety First: Cleaning and Disinfecting Your SpaceNC-v4 INc1: Innovationposted by James Keohane on Jul 7, 2021, 1:24 pm
Is it acceptable to for a LEED v4 BD+C: NC project to seek BOTH innovation point for LEED O&M Starter Kit and a Pilot Credit INPC 137- Safety First: Cleaning and Disinfecting Your Space??... Last reply: Michelle Cordero, May 24, 2024, 12:48 pm |
|
MR Credit: Waste PerformanceLEED v5 O&M Existing Buildings Public Commentsposted by Anna Dengler on May 24, 2024, 12:26 pm
A couple suggestions: There should be an option to qualify for 9 points (or the full number of points, if not 9) by completing TRUE Certification (at any level) since the certification requires... Last reply: Anna Dengler, May 24, 2024, 12:28 pm |
|
LEED v5 BD+C/ID+C Location and Transportation public commentsLEED v5 BD+C/ID+C: Location and Transportation Public Commentsposted by Nadav Malin on Apr 3, 2024, 6:20 am
Share your comments on the first public comment draft of the LEED v5 BD+C/ID+C Location and Transportation category on this forum. You can reply to this thread or use the "Post a Question/Comment... Last reply: Jodie Thill, May 24, 2024, 12:25 pm |
|
First public comment draft of LEED v5 BD+C/ID+C: Integrative ProcessLEED v5 BD+C/ID+C: Integrative Process, Planning, And Assessments Public Commentsposted by Nadav Malin on Apr 2, 2024, 2:08 pmShare your comments on the first public comment draft of the LEED v5 BD+C/ID+C: Integrative Process, Planning, And Assessments section on this forum. You can either reply to this thread or use the... Last reply: Jodie Thill, May 24, 2024, 11:42 am |
|
Green Infrastructure and Buildings: What should be rating system for the chosen building?ND-Plan-v4 GIBp1: Certified green buildingposted by Marine Petrosyan on Sep 12, 2023, 5:27 am
Hi, All! The GIB Prerequisite states, that at least one whole building should be LEED certified. I understand that for the who neighborhood the given LEED v4 ND Plan will work. BUT, what... Last reply: Eliot Allen, May 24, 2024, 11:23 am |
|
Enhanced energy efficiency- Promote energy efficiency instead of discouraging it.LEED v5 BD+C/ID+C: Energy and Atmosphere Public Commentsposted by Alex Edwards on May 24, 2024, 6:20 am
In LEED v5, the ‘Enhanced Energy Efficiency’ category receives a total score of 10 points, compared to LEED v4 and v4.1, which allocated 18 points. This discrepancy raises... |
|
Proposed Design Demand Control VentilationCI-v4 EAp2: Minimum Energy Performanceposted by Luis Andrade on May 16, 2024, 1:30 pm
Hi all, I have a doubt regarding a CI project. The building is served by Dedicated Outdoor Airflow Systems (DOAS) that serves several floors. Our project is regarding only one floor. As... Last reply: Luis Andrade, May 24, 2024, 5:35 am |