EQc6.1 for multi-occupant spacesCI-2009 IEQc6.1: Controllability of systems - lightingposted by Michele Helou on Oct 4, 2010, 12:55 pm
Does anyone know if multi-occupant spaces such as exhibit spaces or lecture rooms without... Last reply: Danuta Drozdowicz, Oct 18, 2010, 9:30 pm |
|
LEED OnlineEBOM-2009 WEp1: Minimum Indoor Plumbing Fixture and Fitting Efficiencyposted by Paul C on Sep 20, 2010, 10:29 am
I want to make sure I am understanding this correctly in filling out LEED Online, I am a little confused when filling out LEED Online: -I have an multi-tenant office building so everyone... Last reply: Dan Ackerstein, Oct 18, 2010, 6:42 pm |
|
Performance Period MeteringEBOM-2009 WEc3: Water Efficient Landscapingposted by Matthew Macko on Oct 5, 2010, 1:56 pm
I have a project that has recently had an irrigation metered installed, but unfortunately it happened after July. The project is running from October to January and cannot be extended through... Last reply: Dan Ackerstein, Oct 18, 2010, 6:32 pm |
|
Hot and humid areaCS-2009 EAc1: Optimize Energy Performanceposted by javier bolanos zeledon on Oct 15, 2010, 12:03 am
I have a CS V2.0 office building project in a hot an humid area, climate zone 3C as per Ashrae. Last reply: javier bolanos zeledon, Oct 18, 2010, 11:15 am |
|
questions about LEED reviewer comments at EAp2NC-2009 EAp2: Minimum Energy Performanceposted by Florian Schmidtchen on Sep 27, 2010, 12:21 am
hello folks, I just received the comments from the reviewer and have some questions about them. The reviewer questioned a lot about the fan power simulation. Q1. AppendixG assumes... Last reply: Christopher Schaffner, Oct 16, 2010, 1:58 pm |
|
Modeling targets and after M&VNC-2009 EAc1: Optimize Energy Performanceposted by Ned Halling on Oct 12, 2010, 12:50 pm
We would like our proposed model to meet a minimum of 30% increased energy performance. After modeling, the potential increase is 44%. Is it possible to submit the credit showing a 30% increase... Last reply: Marcus Sheffer, Oct 16, 2010, 10:04 am |
|
Is Acacia tress a rapid renewable material?CI-2009 MRc6: Rapidly Renewable Materialsposted by Simon Sue on Oct 15, 2010, 6:39 am
i get to know from my supplier that their product was made from Acacia trees and it will growth to maturity below 10 years. i try to check on USGBC or EPA list of renewable resouces material and... Last reply: Simon Sue, Oct 15, 2010, 11:31 pm |
|
LEED Boundary and Non-contiguos staging areaNC-2009 SSc5.1: Site development - protect or restore habitatposted by Nina Bradstreet on Oct 6, 2010, 4:43 pm
I am working on a v3 NC project being built on a site with an abundance of native vegetation. As a result of the presence of all the vegetation we are trying to preserve, we have to move our... Last reply: Tristan Roberts, Oct 15, 2010, 11:07 pm |
|
GID+C Credit on NC Project- Innovation in Design Credit Point?NC-2009 IDc1: Innovation in Designposted by Sara LeMone on Oct 13, 2010, 9:58 am
If a project performs and complies with all requirements of ID IEQc4.5 Low-Emitting Materials--... Last reply: Tristan Roberts, Oct 15, 2010, 11:04 pm |
|
SRI value for an existing copper roofNC-2009 SSc7.2: Heat island effect - roofposted by Bill Swanson on Jan 14, 2010, 4:09 pm
In response to an earlier thread on... Last reply: Tristan Roberts, Oct 15, 2010, 11:02 pm |