Limit Boundary-NC-2009 SSp1: Construction Activity Pollution Preventionposted by gabriel Morales on Dec 6, 2010, 5:42 pm
The project is located on a 2.67 ha L-shaped site and it consists on the following: Last reply: Tristan Roberts, Dec 28, 2010, 9:45 pm |
|
Elaras Question- LEED Certification for High-Rise Multi-familyGeneral forumsposted by Dan Ackerstein on Dec 28, 2010, 7:09 pm
In theory, EBOM... |
|
gross floor areaGeneral forumsposted by Tristan Roberts on Dec 28, 2010, 6:19 pm
No, I don't think you need to include this, just as you wouldn't include an outdoor parking lot. It's not occupied space. |
|
Outdoor Air delivery monitoring with increased ventilation rateCI-2009 IEQc1: Outdoor Air Delivery Monitoringposted by Suraj Shah on Dec 21, 2010, 4:36 am
How does the alarming system work if the project is attempting IEQ credit 2, wherein 30% extra fresh air is provided? Does the set point then change to the designed fresh air quantity & then... Last reply: Tristan Roberts, Dec 28, 2010, 6:12 pm |
|
No adhesives used on a projectCI-2009 IEQc4.1: Low-emitting materials - adhesives and sealantsposted by ari meisel on Dec 14, 2010, 4:00 pm
I have a CI project isn't using ANY adhesives, I believe we meet the intent of the credit but it's not an option, anyone had that situation? Last reply: Tristan Roberts, Dec 28, 2010, 6:08 pm |
|
Linoleum production in USACI-2009 MRc6: Rapidly Renewable Materialsposted by Linda Davisson on Dec 20, 2010, 2:35 pm
I heard a rumor that linoleum may once again be manufactured in the USA. Anyone know a US manufacturer, or why linoleum is not manufactured in the USA? Last reply: Tristan Roberts, Dec 28, 2010, 6:06 pm |
|
SSC1 path 9, Innovative waste water technologyCI-2009 SSc1: Site Selectionposted by Jorng-ren Chern on Oct 7, 2010, 5:14 am
I have chosen to use the Option 1 to document the credit, but the SSc1 template seems to be “WRONG” in the following areas: 1. On the template it says: “The baseline for WE Credit 2 is... Last reply: Tristan Roberts, Dec 28, 2010, 5:50 pm |
|
required documentationCS-2009 EAc3: Enhanced Commissioningposted by Tatjana Ernst on Dec 10, 2010, 4:24 am
we have an CS-Building with an... Last reply: Chris Ladner, Dec 28, 2010, 5:47 pm |
|
Secure bicycle racksCS-2009 SSc4.2: Alternative transportation - bicycle storage and changing roomsposted by Yelena Gipsov on Dec 20, 2010, 7:06 pm
What should be considered as a secure bicycle racks for Commercial Projects 300,000 s.f. or less (vs. non-secure)? If provided racks are outside, do they have to be fully covered? Last reply: Tristan Roberts, Dec 28, 2010, 5:37 pm |
|
ASHRAE Level II audit-Ok to submit for EAp1?EBOM-2009 EAp1: Energy efficiency best management practices - planning, documentation and opportunity assessmentposted by Alice Cook on Dec 28, 2010, 5:20 pm
We hired an outside engineer to perform a level II audit. We essentially skipped the level one writeup and just ensured our final report included both level I and II requirements. Is it okay to... Last reply: Tristan Roberts, Dec 28, 2010, 5:30 pm |