Rainwater Harvesting & Cistern Sizing?Schools-2009 WEc3: Water Use Reductionposted by Tim Hoeft on Nov 1, 2010, 5:18 pm
Can anyone recommend a resource to use for sizing a cistern? By using the LEED Online forms, it is easy to determine the... Last reply: Tristan Roberts, Nov 12, 2010, 10:57 pm |
|
SS1 Path 11 On-site Renewable EnergyCI-2009 SSc1: Site Selectionposted by Timothy Fry on Nov 4, 2010, 3:54 pm
The building we are outfitting has Solar PV on site, an estimated 17,800kWh annual production. Half of it feeds a DC power Hydrogen electrolyzer that is used within the building and the other... Last reply: Tristan Roberts, Nov 12, 2010, 10:42 pm |
|
Controller Efficiency (CE) dataNC-2009 WEc1: Water Efficient Landscapingposted by eileen hughes on Nov 3, 2010, 7:16 pm
I am having trouble obtaining manufacterers documentation for the following: Last reply: Amy Rider, Nov 12, 2010, 7:52 pm |
|
50% FSCEBOM-2009 MRc1: Sustainable purchasing - ongoing consumablesposted by Simon Sue on Nov 3, 2010, 5:32 am
one of the requirement that project owner can approach is to purchase product consists of 50%... Last reply: Tristan Roberts, Nov 12, 2010, 6:13 pm |
|
Engineered or laminated wood flooringSchools-2009 IEQc4.3: Low-Emitting Materials—Flooring Systemsposted by Jan Stensland on Nov 3, 2010, 2:30 pm
For LEED for Schools, could an engineered or laminated... Last reply: Tristan Roberts, Nov 12, 2010, 4:08 pm |
|
Template Needed for CS WEp1CS-2009 WEp1: Water Use Reductionposted by Craig Sheehy on Nov 3, 2010, 2:00 pm
Does anybody have a blank CS WEp1 template with the correct public lavatory sink flow rate (.5) in the baseline table? I do not have any new CS projects registered but need to evaluate a... Last reply: Tristan Roberts, Nov 12, 2010, 4:06 pm |
|
Bus Stop FrequencyNC-2009 SSc4.1: Alternative transportation - public transportation accessposted by Jena Lester on Nov 12, 2010, 1:16 pm
I'm am working on a project that has (2) bus lines that service the site that are both within a 1/4 mile radius. One line has an all day service route scheduled and the other only has rush hour... Last reply: Tristan Roberts, Nov 12, 2010, 1:44 pm |
|
Option 4 for non residential project 2003 ITE studyNC-2009 SSc4.4: Alternative transportation - parking capacityposted by Florian Schmidtchen on Nov 7, 2010, 11:05 pm
I am working on a production facility located in China with no local zoning requirements regarding the parking capacity. Last reply: Tristan Roberts, Nov 12, 2010, 12:12 pm |
|
out buildings and LEEDGeneral forumsposted by Tristan Roberts on Nov 11, 2010, 9:32 pm
Sean, since these are in your LEED boundary they should be considered for all relevant LEED credits—which will be most of them. Since they're small and unoccupied, I don't think you need to... Last reply: Cara Mae Cirignano, Nov 12, 2010, 12:11 pm |
|
Campus RecyclingSchools-2009 MRp1: Storage and Collection of Recyclablesposted by Tim Hoeft on Nov 9, 2010, 9:16 am
Our project is on a community college campus that has a dedicated recycling area for the campus that is not within our LEED project area. Is it acceptable to reference this area in the narrative... Last reply: Tristan Roberts, Nov 12, 2010, 11:54 am |